Maintenance
206
6.21 Starting up after periods of standstill
Note:
Before extended periods of downtime or when starting up your cutter after periods at a standstill,
contact the Zünd Customer Service department or your service partner.
Generally, the machine can be started up immediately, even after prolonged periods of standstill.
However, some options require running-in routines, which must be heeded in order to ensure
continued maintenance-free operation.
6.21.1 Running-in routine 1-9 kW/1-15 kW/1-15 kW plus vacuum turbine
The running-in routine must be carried out after periods of standstill > 6 days.
A
Activate all vacuum zones.
B
Select
1-8-1-10 Running-in routine
in the menu.
Results
The running-in routine for the vacuum generator starts (duration approx. 8 min). The remaining time
will be displayed on the operating unit.
Содержание S3 M-1200
Страница 1: ...Operating Manual S3 Digital Cutter ...
Страница 5: ...Contents 5 8 Modules 209 9 Material handling 211 10 Additional specifications 213 ...
Страница 6: ...Contents 6 ...
Страница 10: ...Introduction 10 ...
Страница 14: ...Product description 14 2 5 Cutter overview ...
Страница 38: ...Product description 38 ...
Страница 64: ...Safety 64 ...
Страница 90: ...Controls and operation 90 4 13 3 Inserting replacing the module ...
Страница 103: ...Controls and operation 103 Plastic perforated plate Adjustable vacuum range Leather no ...
Страница 134: ...Controls and operation 134 ...
Страница 139: ...Tips for cutting 139 T Material thickness Z Set depth TM Cutting depth material thickness t set depth z ...
Страница 155: ...Tips for cutting 155 5 6 2 Calculation of maximum speed for EOT POT Z16 Z42 ...
Страница 161: ...Maintenance 161 Description Task marker pen slotted screwdriver needle nosed pliers cutter blades ...
Страница 187: ...Maintenance 187 B Cut the conveyor belt using scissors and remove it C Dispose of the conveyor belt correctly ...
Страница 207: ...Tools 207 7 Tools ...
Страница 208: ...Tools 208 ...
Страница 209: ...Modules 209 8 Modules ...
Страница 210: ...Modules 210 ...
Страница 211: ...Material handling 211 9 Material handling ...
Страница 212: ...Material handling 212 ...
Страница 213: ...Additional specifications 213 10 Additional specifications ...
Страница 214: ...Additional specifications 214 ...