Controls and operation
117
4.16.2 Initialization process
Caution:
Risk of injury during tool initialization!
The front light barriers are not active during manual initialization!
• Do not touch the operating area of the tool during initialization.
• Define the zero point with the AKI.
1-1-1-2-2 Auto init
Using AKI, the tip of the tool insert is
set exactly to the height of the working
surface (cutting/routing base). This value
serves as a starting point for setting
the
up position
and
the down position
.
1-1-1-2-3 Up Z pos
The up position defines the distance
between the zero point and the raised
tool. Select this value according to the
material and its folding properties. A short
distance between processing material
and raised tool generally means a shorter
processing time.
1-1-1-2-4 Down Z pos
The down position defines the cutting
depth of the tool into the cutting/routing
base. This is necessary in order to cut
completely through the processing
material. Down position is dependent
on the processing material and the
processing method.
1-1-1-2-5 Test cut
Always perform the test cut with the
processing material and the processing
parameters of the original job. If the
Содержание S3 M-1200
Страница 1: ...Operating Manual S3 Digital Cutter ...
Страница 5: ...Contents 5 8 Modules 209 9 Material handling 211 10 Additional specifications 213 ...
Страница 6: ...Contents 6 ...
Страница 10: ...Introduction 10 ...
Страница 14: ...Product description 14 2 5 Cutter overview ...
Страница 38: ...Product description 38 ...
Страница 64: ...Safety 64 ...
Страница 90: ...Controls and operation 90 4 13 3 Inserting replacing the module ...
Страница 103: ...Controls and operation 103 Plastic perforated plate Adjustable vacuum range Leather no ...
Страница 134: ...Controls and operation 134 ...
Страница 139: ...Tips for cutting 139 T Material thickness Z Set depth TM Cutting depth material thickness t set depth z ...
Страница 155: ...Tips for cutting 155 5 6 2 Calculation of maximum speed for EOT POT Z16 Z42 ...
Страница 161: ...Maintenance 161 Description Task marker pen slotted screwdriver needle nosed pliers cutter blades ...
Страница 187: ...Maintenance 187 B Cut the conveyor belt using scissors and remove it C Dispose of the conveyor belt correctly ...
Страница 207: ...Tools 207 7 Tools ...
Страница 208: ...Tools 208 ...
Страница 209: ...Modules 209 8 Modules ...
Страница 210: ...Modules 210 ...
Страница 211: ...Material handling 211 9 Material handling ...
Страница 212: ...Material handling 212 ...
Страница 213: ...Additional specifications 213 10 Additional specifications ...
Страница 214: ...Additional specifications 214 ...