Maintenance
164
6.3 Maintenance list for trained operating personnel
6.3.1 Special interval
Every 24 operating hours with a router module (RM-S)
The amount of chips produced during machining depends on several parameters. Therefore, the
interval is only a guideline that can be extended or shortened depending on the presence of chips
within the beam.
Beam
Cleaning the inside of the beam
on page 175.
6.3.2 Daily
Safety devices
Ensure that all EMERGENCY STOP control devices are easy to access and not hidden
Check light barriers on the beam
Cutter, general
Visually check the machine for damage
Clean the machine of dust and processing residue
AKI tool initialization
Clean the optical conductor of dust and processing residue
6.3.3 Weekly
Safety devices
Check function of EMERGENCY STOP control devices
Advance (option)
Clean rubber pads of the feeder elements
Clean feed guide rail
Compressor (option)
Check the oil level; top off oil according to specifications, if necessary (carry out maintenance
according to the manufacturer's operating manual)
Содержание S3 M-1200
Страница 1: ...Operating Manual S3 Digital Cutter ...
Страница 5: ...Contents 5 8 Modules 209 9 Material handling 211 10 Additional specifications 213 ...
Страница 6: ...Contents 6 ...
Страница 10: ...Introduction 10 ...
Страница 14: ...Product description 14 2 5 Cutter overview ...
Страница 38: ...Product description 38 ...
Страница 64: ...Safety 64 ...
Страница 90: ...Controls and operation 90 4 13 3 Inserting replacing the module ...
Страница 103: ...Controls and operation 103 Plastic perforated plate Adjustable vacuum range Leather no ...
Страница 134: ...Controls and operation 134 ...
Страница 139: ...Tips for cutting 139 T Material thickness Z Set depth TM Cutting depth material thickness t set depth z ...
Страница 155: ...Tips for cutting 155 5 6 2 Calculation of maximum speed for EOT POT Z16 Z42 ...
Страница 161: ...Maintenance 161 Description Task marker pen slotted screwdriver needle nosed pliers cutter blades ...
Страница 187: ...Maintenance 187 B Cut the conveyor belt using scissors and remove it C Dispose of the conveyor belt correctly ...
Страница 207: ...Tools 207 7 Tools ...
Страница 208: ...Tools 208 ...
Страница 209: ...Modules 209 8 Modules ...
Страница 210: ...Modules 210 ...
Страница 211: ...Material handling 211 9 Material handling ...
Страница 212: ...Material handling 212 ...
Страница 213: ...Additional specifications 213 10 Additional specifications ...
Страница 214: ...Additional specifications 214 ...