ZXG10 iBSC Hardware Installation Guide
Stage
Instruments and Tools
Function
Steel tape
To measure whether the cabinet position
complies with cabinet installation
standards;
To check hole interval and diameter.
Screwdriver
To mount board, cable, and shelf.
Marker pen
To mark the positions of connection holes
on the anti-static floor;
To mark the positions of the expansion
bolts for the base installation on the
cement floor.
Marking template
Provided with the delivery of the goods.
It is must be ready before the cabinet
installation.
It is a template when marking on the
cement floor.
Percussion
drill
(with
Ф14 drill bit)
To drill holes on the ground and anti-static
floor.
Electric saw
To cut the cabling outlets under anti-static
floor.
Vacuum cleaner
To vacuum the dust after drilling.
Rubber hammer
To enhance the fixation of the expansion
bolt.
Spanner
To fix the bolts and the nuts.
Positioning
cabinet and
base
Washer
To adjust the levelness of the base.
Torque wrench (45 Nm)
To tighten the bolts connecting the base
and the cabinet.
Horizontal ruler
To adjust the level of the cabinet.
Plumb
To check the verticalness of the cabinet.
Fixing base
and cabinet
Common spanner
To adjust the height of the feet.
Insulation
Test
Multimeter
To measure the resistance between the
cabinet feet and the ground expansion
bolts.
Installing
Hardware
Installation
acceptance
test
Earth resistance tester
To measure the ground resistance of the
grounding system.
3-2
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Содержание ZXG10 iBSC
Страница 8: ...II ...
Страница 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...
Страница 168: ...Figures This page intentionally left blank ...