Chapter 1 Safety Instruction
Hoisting Heavy Objects
Warning!
Do not walk or stay under the hoisted objects during hoisting operations.
l
Ensure a proper hoisting capability of the hoister when disassembling heavy
equipment moving, and replacing equipment.
l
The operator must receive the training and qualification for hoisting operations. In-
spect and complete the hoisting tools before getting into service.
l
Make sure to fix the hoisting tools firmly on a sufficiently secured object or wall before
the hoisting operation.
l
Use brief oral instructions during the hoisting operations to prevent mistaken
operation.
Plugging/Unplugging Modules
The modules mentioned in this document include front board, rear board, and fan module.
Caution!
l
Avoid inserting a module forcibly. Otherwise, the pin on the backplane may bent.
l
Align the module with the guide rail and push it gently to the backplane. Plug the
module properly into the slot to prevent short circuit due to contact between the module
and the circuit surface.
l
Avoid touching the circuits, components, connectors, and cable troughs when holding
a module.
l
RF module turns hot when running.
Avoid being scalded when plugging and
unplugging an RF module.
Personnel
Caution!
Do not conduct internal maintenance or equipment debugging without prior permission.
Replacing parts or changing equipment may incur extra danger, therefore, do not replace
parts or change the equipment without prior permission. To ensure safety, please contact
ZTE in case of any problem.
1-5
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Содержание ZXG10 iBSC
Страница 8: ...II ...
Страница 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...
Страница 168: ...Figures This page intentionally left blank ...