ZXCBTS (V5.4) CDMA Micro Base Transceiver Station & Remote Station Installation Manual
8-24
cables should also be grounded at three points, that is, on the antenna pole, on
the rooftop, and on the wall before the cables are led into the equipment room.
3) Before leading the primary feeder cable along the outdoor cabling ladder from
the top of the building to the equipment room, check whether the cabling ladder
is grounded. If not, request the network operator to accomplish it as soon as
possible.
2. Procedures to install the grounding kit
Caution:
It is prohibited to install the grounding kit in thunderstorm weather;
otherwise, the installation personnel might be hurt.
When installing the grounding kit, be sure to keep the feeder cable at the joint
straight.
1) Prepare such tools as paper knife, straight screwdriver, spanner and sharp nose
pliers.
2) Choose a suitable position for installing the grounding kit, and cut the sheath off
the 7/8" feeder cable based on the size of the grounding kit. The structure of a
grounding kit is shown in Fig. 8.7-1.
Grounding terminal
Grounding cable
Feeder cable
Grounding wire clip
Out-layer copper
core of feeder cable
Sheet copper of
feeder cable
Fig. 8.7-1 Structure of a Grounding Kit
3) Lead the grounding cable of the lightning grounding kit to the grounding net.
Keep the angle between the grounding cable and the primary feeder cable no
more than 15°.
Содержание ZXCBTS M190T
Страница 1: ...ZXCBTS V5 4 CDMA Micro Base Transceiver Station RF Remote Station Installation Manual ZTE CORPORATION ...
Страница 4: ......
Страница 16: ......
Страница 30: ......
Страница 38: ......
Страница 46: ......
Страница 68: ......
Страница 100: ......
Страница 122: ......
Страница 174: ......