ZXCBTS (V5.4) CDMA Micro Base Transceiver Station & Remote Station Installation Manual
8-22
Feeder cable window One-time bending,
with the min. radius
of more than 90mm
Cabling rack
Hanger
Outdoors
Indoors
Fig. 8.6-13 Leading the Feeder Cable into the Equipment Room - Mode 1
Feeder cable
window
One-time bending,
with the min. radius
of more than 90mm
Hanger
Cabling rack
Indoors
Outdoors
Fig. 8.6-14 Leading the Feeder Cable into the Equipment Room - Mode 2
2) The feeder cables are led into the equipment room through the feeder cable
window. The outdoor and indoor cabling racks are used for leading them.
2. Procedures
1) Loosen the fasteners on the feeder cable window and remove the cover from the
holes.
2) Lead the feeder cables into the equipment room. Two people in and out of the
room respectively should cooperate when leading the cables to prevent
damaging both the equipment and the cable. Screw down the fastening hoop
after the feeder cables are pulled in position.
3) Cut the feeder cables. The following should be done before cutting them:
Содержание ZXCBTS M190T
Страница 1: ...ZXCBTS V5 4 CDMA Micro Base Transceiver Station RF Remote Station Installation Manual ZTE CORPORATION ...
Страница 4: ......
Страница 16: ......
Страница 30: ......
Страница 38: ......
Страница 46: ......
Страница 68: ......
Страница 100: ......
Страница 122: ......
Страница 174: ......