Chapter
1
Overview
1-7
1.4 Points for Attention
Pay attention to the following points during the installation: The installation personnel
should be trained to obtain the qualification entitled by ZTE and read this manual
before the installation.
1. Do not operate on the cabinet or any module when the power is on.
2. Observe the relative requirements strictly when installing the BTS.
3. Do not install the antenna feeder system in thunder weather.
4. Before the thunder storm season of each year comes, check whether the
lightning arrester is in good condition and is well contacted. If it is damaged,
replace it immediately.
5. When the installation of the cabinet completes, lock the door immediately. If the
door need be opened in case of maintenance, contact the professional personnel
for help.
Содержание ZXCBTS M190T
Страница 1: ...ZXCBTS V5 4 CDMA Micro Base Transceiver Station RF Remote Station Installation Manual ZTE CORPORATION ...
Страница 4: ......
Страница 16: ......
Страница 30: ......
Страница 38: ......
Страница 46: ......
Страница 68: ......
Страница 100: ......
Страница 122: ......
Страница 174: ......