ZXCBTS (V5.4) CDMA Micro Base Transceiver Station & Remote Station Installation Manual
8-18
Pulley block
The rope for
pulling the cable
up the tower
The feeder cable
connector is wrapped
Tie a knot with the rope on the feeder cable at the
place 0.4m away from the connector and then
another knot about 3.4m away from the connector
Use this rope to pull the feeder cable away
from the tower to prevent damaging the cable
and the connector when raising the cable
Label
Fig. 8.6-8 Schematic Diagram of Pulling the Feeder Cable Up the Tower
8.6.5 Laying and Fastening Primary Feeder Cable
1. Cabling
principles
1) The primary feeder cables should be laid in order on the cabling rack after being
led into the equipment room through the feeder cable window.
2) The primary feeder cables should be laid without crossings along the outdoor
cabling rack and the cabling ladder of the tower.
3) Be familiar with the cabling route of the primary feeder cables and draw it on
paper in advance to ensure there are no crossings during the actual cabling.
Содержание ZXCBTS M190T
Страница 1: ...ZXCBTS V5 4 CDMA Micro Base Transceiver Station RF Remote Station Installation Manual ZTE CORPORATION ...
Страница 4: ......
Страница 16: ......
Страница 30: ......
Страница 38: ......
Страница 46: ......
Страница 68: ......
Страница 100: ......
Страница 122: ......
Страница 174: ......