5.6.4.3 Raising main boom with fixed jib
Move right control lever to the left to raise the boom until it reaches required position, which is
shown in the figure 5-70.
Figure 5-70 Raising main boom with fixed jib
CAUTION
The following safety notes must be observed when erecting and lowering main boom
with fixed jib:
(1) The boom should be positioned straight ahead of the crawler crane (i.e. the drive
sprocket is at the back of crane).
(2) Before erecting the boom, a certain length of hoisting rope should be unwound to
guarantee that the load hook is still in contact with the ground before the boom
angle has reached 30°. Before lowering the boom, a certain length of hoisting rope
should be unwound to ensure that the load hook is lowered down on the ground
once the boom angle is less than 30°.
(3) The boom should be erected or lowered stably at even speed.
Содержание ZCC1100H
Страница 2: ......
Страница 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Страница 4: ......
Страница 6: ......
Страница 12: ......
Страница 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Страница 14: ......
Страница 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Страница 22: ......
Страница 80: ......
Страница 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Страница 82: ......
Страница 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Страница 140: ......
Страница 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Страница 206: ......