![Zoomlion ZCC1100H Скачать руководство пользователя страница 272](http://html1.mh-extra.com/html/zoomlion/zcc1100h/zcc1100h_operators-manual_938545272.webp)
Operator’s Manual for Crawler Crane
A
s
s
e
m
b
ly
a
n
d
D
is
m
a
n
tli
n
g
5-66
5.5.3 Electrical connection to main boom
5.5.3.1 Wire layout of main boom
The arrangement of electrical parts on main boom is shown in figure 5-60:
Figure 5-60 Arrangement of electrical parts on main boom
Functions of electrical parts are shown in the table 5-16:
Table 5-16 Functions of electrical parts
No.
Description
Instructions
1
Main boom cable drum
assy.
Connect the slewing table cable and junction box on the
main boom head
2
Fixed jib cable drum assy.
Connect the junction box on the main boom head to the
junction box on the fixed jib head
3
Anemometer and warning
light on the boom head
Measure wind speed and send a warning in the air
4
Main boom junction box
Establish electrical connection to various electrical parts
of main boom head
5
Hoisting limit switch for H1
winch
Prevent winch 1 from over hoisting
6
Hoisting limit switch for H2
winch
Prevent winch 2 from over hoisting
1
2 3 4 5 6
Содержание ZCC1100H
Страница 2: ......
Страница 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Страница 4: ......
Страница 6: ......
Страница 12: ......
Страница 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Страница 14: ......
Страница 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Страница 22: ......
Страница 80: ......
Страница 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Страница 82: ......
Страница 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Страница 140: ......
Страница 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Страница 206: ......