Operator’s Manual for Crawler Crane
A
s
s
e
m
b
ly
a
n
d
D
is
m
a
n
tli
n
g
5-36
Code
Names of the components
Length
Weight
G33
6m fixed jib intermediate section
19'8" (6m)
362 lb (0.16t)
G37
FA-frame
/
545 lb (0.25t)
G70
Main boom tilting-back support
/
300 lb (0.14t)
G74
Front tilting-back support of fixed jib
/
102 lb (0.05t)
G75
Rear tilting-back support of fixed jib
/
78 lb (0.04t)
DANGER
(1) It is prohibited to use any other boom configurations and anchoring rods
combination that have not been stipulated in the operator’s manual or installation
drawings.
(2) When assembling boom sections, make sure that the intermediate sections are
assembled in their specified positions. Otherwise, there is a risk of accidents.
CAUTION
(1) The principles for boom section combination and anchoring rods combination
under SF-1 boom configuration are the same as those under S-2 and SF-2 boom
configurations.
(2) The principles for boom section combination and anchoring rods combination
under S-3 boom configuration are the same as those under S-1 boom configuration.
Содержание ZCC1100H
Страница 2: ......
Страница 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Страница 4: ......
Страница 6: ......
Страница 12: ......
Страница 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Страница 14: ......
Страница 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Страница 22: ......
Страница 80: ......
Страница 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Страница 82: ......
Страница 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Страница 140: ......
Страница 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Страница 206: ......