![Zoomlion ZCC1100H Скачать руководство пользователя страница 220](http://html1.mh-extra.com/html/zoomlion/zcc1100h/zcc1100h_operators-manual_938545220.webp)
Operator’s Manual for Crawler Crane
A
s
s
e
m
b
ly
a
n
d
D
is
m
a
n
tli
n
g
5-14
5.2.2.4 Assembly of right crawler carrier
The process of assembling right crawler carrier:
a) Confirm that left crawler carrier is in contact with the ground (see the figure 5-14). At this
time, the crane is inclined slightly, and the superstructure can slew freely.
b) Lift right crawler carrier from the low-loader, and assemble it onto the undercarriage
central section by use of mounting cylinder and main boom pivot section. If necessary, use
right horizontal cylinder to assemble crawler carrier.
c)
Adjust the height of support cylinder to allow left and right crawler carriers to contact the
ground. Extend right horizontal cylinder to working position.
Figure 5-14 Assembly of right crawler carrier
DANGER
When only one crawler carrier is attached on the crane, the operator must first make this
crawler carrier come into contact with the ground, and then slew the tail end of slewing
table above the crawler carrier. Otherwise, serious injury or property damage will occur.
Содержание ZCC1100H
Страница 2: ......
Страница 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Страница 4: ......
Страница 6: ......
Страница 12: ......
Страница 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Страница 14: ......
Страница 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Страница 22: ......
Страница 80: ......
Страница 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Страница 82: ......
Страница 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Страница 140: ......
Страница 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Страница 206: ......