Operator’s Manual for Crawler Crane
A
s
s
e
m
b
ly
a
n
d
D
is
m
a
n
tli
n
g
5-24
c)
When central counterweight is aligned with the undercarriage central section, attach the
hooks at the upper side of central counterweight to the attachment points on the
undercarriage central section. See the figure 5-25.
Figure 5-25 Attachment of upper hook of central counterweight
d) Slowly extend mounting cylinder to make central counterweight rotate around the upper
attachment points until the central counterweight is in contact with the undercarriage
central section completely.
e) After the central counterweight is assembled, keep the connection between the mounting
cylinder and central counterweight. See the figure 5-26.
f)
Unwind derricking rope properly, and then retract mounting cylinder slowly. At this time,
main boom pivot section is pulled down to a proper position with the help of mounting
cylinder. See the figure 5-27.
g) When main boom pivot section can be lowered by itself, remove the rope between
mounting cylinder and central counterweight. Then the assembly of central counterweight
on one side of crane is finished.
Содержание ZCC1100H
Страница 2: ......
Страница 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Страница 4: ......
Страница 6: ......
Страница 12: ......
Страница 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Страница 14: ......
Страница 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Страница 22: ......
Страница 80: ......
Страница 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Страница 82: ......
Страница 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Страница 140: ......
Страница 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Страница 206: ......