![Zoomlion ZCC1100H Скачать руководство пользователя страница 275](http://html1.mh-extra.com/html/zoomlion/zcc1100h/zcc1100h_operators-manual_938545275.webp)
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
A
s
s
e
m
b
ly
a
n
d
D
is
m
a
n
tli
n
g
5-69
Figure 5-62 Raising main boom
CAUTION
(1) Always monitor the wire rope in process of raising main boom to make sure that the
wire rope on boom head is kept in the rope groove all the time.
(2) Before main boom is raised to 30° position, make sure that the hook is in contact
with the ground. After main boom is raised to 30° position, the hook can be lifted
away from the ground.
(3) The boom-raising movement should be performed slowly and stably. And during the
operation, the crane operator must observe the data shown on the screen, while
other workers should pay attention to environmental changes.
(4) Standing beneath the boom frame is prohibited.
(5) Working radius stipulated in the load capacity charts should be adhered to, even if
no load is attached on the load hook! If this is not observed, the crane may topple
over!
Содержание ZCC1100H
Страница 2: ......
Страница 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Страница 4: ......
Страница 6: ......
Страница 12: ......
Страница 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Страница 14: ......
Страница 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Страница 22: ......
Страница 80: ......
Страница 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Страница 82: ......
Страница 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Страница 140: ......
Страница 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Страница 206: ......