![Zoomlion ZCC1100H Скачать руководство пользователя страница 229](http://html1.mh-extra.com/html/zoomlion/zcc1100h/zcc1100h_operators-manual_938545229.webp)
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
A
s
s
e
m
b
ly
a
n
d
D
is
m
a
n
tli
n
g
5-23
a) Stop the transport vehicle with central counterweight attached at the side of basic machine,
and lift the central counterweight from the vehicle via mounting cylinder. See the figure
5-23.
<4500
<14'9"
Figure 5-23 Unloading of central counterweight
b) Raise main boom pivot section to make central counterweight move backwards, and then
adjust the height of central counterweight via mounting cylinder. (Note: The angle of main
boom pivot section can not exceed 84°.) See the figure 5-24.
Figure 5-24 Assembly of central counterweight
Unit: ft (mm)
Содержание ZCC1100H
Страница 2: ......
Страница 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Страница 4: ......
Страница 6: ......
Страница 12: ......
Страница 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Страница 14: ......
Страница 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Страница 22: ......
Страница 80: ......
Страница 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Страница 82: ......
Страница 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Страница 140: ......
Страница 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Страница 206: ......