![Zoomlion ZCC1100H Скачать руководство пользователя страница 267](http://html1.mh-extra.com/html/zoomlion/zcc1100h/zcc1100h_operators-manual_938545267.webp)
Operator’s Manual for Crawler Crane
Operator’s Manual for Crawler Crane
A
s
s
e
m
b
ly
a
n
d
D
is
m
a
n
tli
n
g
5-61
1
2
Figure 5-53 Bolt preassembled main boom sections to main boom pivot section
The components used in connecting main boom sections are shown in the table 5-14, and the
serial numbers in the table is the same with those in figure 5-52, and figure 5-53.
Table 5-14 Components used to connect main boom sections
No.
Names of the
components
Illustration
1
Double tapered pin
7.52" (191mm)
4.13" (105mm)
1.
77"
(4
5mm)
2
Retaining pin
DANGER
(1) The connecting pin must always be fitted from outside inwards during assembly.
(2) It is prohibited to put hand or fingers into the connecting hole during assembly.
(3) No person is allowed to stand beneath or in the boom during assembly.
(4) It is prohibited to climb up the boom, stand or walk on the boom.
(5) Use a ladder or other similar tools to carry out assembly operation.
Содержание ZCC1100H
Страница 2: ......
Страница 3: ...Edition 1 5 2014 ZCC1100H Crawler Crane Operator s Manual ...
Страница 4: ......
Страница 6: ......
Страница 12: ......
Страница 13: ...履带起重机操作手册 第一章 安全操作说明 Operator s Manual for Crawler Crane Chapter 1 Safety ...
Страница 14: ......
Страница 21: ...履带起重机操作手册 第二章 起重机的描述 Operator s Manual for Crawler Crane Chapter 2 Description of Crane ...
Страница 22: ......
Страница 80: ......
Страница 81: ...履带起重机操作手册 第三章 安全准则 Operator s Manual for Crawler Crane Chapter 3 Safety Guidelines ...
Страница 82: ......
Страница 139: ...履带起重机操作手册 第四章 起重机的操作 Operator s Manual for Crawler Crane Chapter 4 Crane Operation ...
Страница 140: ......
Страница 205: ...履带起重机操作手册 第五章 安装说明 Operator s Manual for Crawler Crane Chapter 5 Assembly and Dismantling ...
Страница 206: ......