08 - 15
08 - 15
c)
c) The inspection
The inspection of loweri
of lowering limi
ng limit sw
t switch can
itch can be carr
be carried out
ied out as follows
as follows::
–
–
T
Telescope out the boom to its maximum length;
elescope out the boom to its maximum length;
–
–
Lift the boom to its maximum angle and reel off the wire rope slowly;
Lift the boom to its maximum angle and reel off the wire rope slowly;
Crane inspections
Crane inspections
–
–
Require another person to observe rope guiding condition;
Require another person to observe rope guiding condition;
–
–
Check
Check whether
whether the
the lowering
lowering limit
limit switch
switch is
is activated
activated when
when only
only 3
3 hoist
hoist rope
rope
windings are left on the winch.
windings are left on the winch.
–
–
Check main / auxiliary winch in the same method.
Check main / auxiliary winch in the same method.
Risk of serious accident due to
Risk of serious accident due to abnormal operation of safety devices!
abnormal operation of safety devices!
Danger
Danger
Содержание QY30V
Страница 8: ......
Страница 10: ......
Страница 36: ......
Страница 56: ......
Страница 94: ......
Страница 144: ...04 49 04 49 Operation crane superstructure Operation crane superstructure Fig 04 40 Fig 04 40...
Страница 146: ......
Страница 156: ...05 9 05 9...
Страница 158: ......
Страница 170: ......
Страница 202: ......
Страница 242: ...08 39 08 39 M60 M60 66 66 1008 1008 1418 1418...
Страница 244: ......
Страница 272: ...09 27 09 27...
Страница 274: ......