![Zoomlion QY30V Скачать руководство пользователя страница 111](http://html1.mh-extra.com/html/zoomlion/qy30v/qy30v_manual_938532111.webp)
04-16
04-16
Operation – crane superstructure
Operation – crane superstructure
If the fuel tank has been run dry, always deaerate the whole fuel system
If the fuel tank has been run dry, always deaerate the whole fuel system
before adding fuel.
before adding fuel.
Do not run
Do not run the fuel ta
the fuel tank dry!
nk dry!
d)
d) Checking
Checking the
the coolant
coolant level
level
Add it timely once the coolant level is too low.
Add it timely once the coolant level is too low.
e)
e) Checking
Checking general
general conditions
conditions of
of crane
crane
1)
1) Check lubr
Check lubricating conditions
icating conditions of each
of each moving p
moving part of
art of the crane.
the crane. Add lubric
Add lubricating
ating
oil or grease timely to ensure
oil or grease timely to ensure lubricating effect;
lubricating effect;
2)
2) Check that
Check that the crane
the crane is pr
is properly supported
operly supported on a
on a level load-bearing
level load-bearing surface,
surface,
and has been set up horizontally;
and has been set up horizontally;
3)
3) Check that
Check that the toothed
the toothed ring of
ring of the slew
the slewing ring
ing ring connection is
connection is clean;
clean;
4)
4) Check that
Check that the front
the front and rear p
and rear parts of
arts of oil cooler
oil cooler and A/C r
and A/C radiator have been
adiator have been
cleaned and are free of blockage;
cleaned and are free of blockage;
5)
5) Ensure that
Ensure that there are
there are no people
no people or object
or objects in
s in the cr
the crane danger
ane danger zone;
zone;
6)
6) Make sure
Make sure that the
that the cable /
cable / rope drums
rope drums and sensors
and sensors are free
are free of snow
of snow and ice;
and ice;
7)
7) Make sure
Make sure that there
that there are no
are no loose parts
loose parts on the
on the superstructure (
superstructure (specially on
specially on the
the
telescopic boom);
telescopic boom);
8)
8) Ensure that
Ensure that both the
both the left and
left and right joysticks
right joysticks in operator’s
in operator’s cab are
cab are in their
in their neutral
neutral
positions before engaging the PTO;
positions before engaging the PTO;
9)
9) Ensure that
Ensure that all the
all the outrigger contro
outrigger control levers
l levers are in
are in their neutral
their neutral positions;
positions;
10)
10) Make sure
Make sure that parking
that parking brake is
brake is applied.
applied.
4.3
4.3.2 S
.2 Starting and
tarting and stop
stop ping
ping the engine
the engine
For the starting and stopping the engine in driver’s cab, please refer to the operating
For the starting and stopping the engine in driver’s cab, please refer to the operating
instructions in Chapter 3 "Operation –
instructions in Chapter 3 "Operation – crane chassis”.
crane chassis”.
Starting and stopping the engine in operator’s cab should be carried out in accordance
Starting and stopping the engine in operator’s cab should be carried out in accordance
with the following operating instructions.
with the following operating instructions.
a)
a) Stopping
Stopping the
the engine
engine
Press and hold the switch “Engine off” on the instrument panel for 1 to 2 seconds to
Press and hold the switch “Engine off” on the instrument panel for 1 to 2 seconds to
switch off the engine.
switch off the engine.
Press the switch “Emergency off” to switch off the engine
Press the switch “Emergency off” to switch off the engine in an emergency.
in an emergency.
b)
b) Starti
Starting
ng the
the engine
engine
The ignition starter switch on the instrument panel can be used to switch on the
The ignition starter switch on the instrument panel can be used to switch on the
engine if the following prerequisites are met:
engine if the following prerequisites are met:
1)
1) PTO
PTO has
has been
been engaged;
engaged;
Содержание QY30V
Страница 8: ......
Страница 10: ......
Страница 36: ......
Страница 56: ......
Страница 94: ......
Страница 144: ...04 49 04 49 Operation crane superstructure Operation crane superstructure Fig 04 40 Fig 04 40...
Страница 146: ......
Страница 156: ...05 9 05 9...
Страница 158: ......
Страница 170: ......
Страница 202: ......
Страница 242: ...08 39 08 39 M60 M60 66 66 1008 1008 1418 1418...
Страница 244: ......
Страница 272: ...09 27 09 27...
Страница 274: ......