See Fig. 04 – 38
See Fig. 04 – 38
Operation – crane superstructure
Operation – crane superstructure
Ensure that the following preconditions are fulfilled:
Ensure that the following preconditions are fulfilled:
–
–
The outriggers have already been extended;
The outriggers have already been extended;
–
–
The main boom has been fully telescoped in and turned to
The main boom has been fully telescoped in and turned to the side or rear working
the side or rear working
area.
area.
See Fig. 04 – 38.
See Fig. 04 – 38.
a)
a) Derrick
Derrick boom
boom down and
down and place
place hook
hook (a)
(a) on
on the gr
the ground;
ound;
b)
b) Remove
Remove the
the rope
rope securing
securing tube
tube (b);
(b);
c)
c) Remove
Remove hoisting
hoisting limit
limit switch
switch weight
weight (c)
(c) from
from wire
wire rope;
rope;
d)
d) Remove
Remove the
the pouch
pouch socket;
socket;
e)
e) When rope reevi
When rope reeving is
ng is in odd
in odd reeving number
reeving number, install
, install the pouch socket
the pouch socket onto the
onto the
hook;
hook;
f)
f)
Change
Change rope
rope reevings
reevings (d).
(d).
(1
(1)
) Install the
Install the hois
hois ting limit swit
ting limit swit ch weight according to rope ree
ch weight according to rope reeving numb
ving numb er
er..
When it is in even reeving number, attach the weight onto the branch with
When it is in even reeving number, attach the weight onto the branch with
pouch so
pouch so cket; when it is
cket; when it is in odd
in odd ree
reeving numb
ving numb er
er, a
, attach the we
ttach the weight onto
ight onto the
the
branch
branch adjacent to th
adjacent to th e branch wi
e branch wi th p
th p ouch
ouch socket. See
socket. See Fig. 0
Fig. 04 – 39
4 – 39..
a
a
b
b
Fig. 04 – 39
Fig. 04 – 39
(2
(2)
) Spool the
Spool the rope smoothly a
rope smoothly and orderly onto the
nd orderly onto the drum.
drum.
(3
(3)
) For me
For method
thod s of installing po
s of installing po uch sock
uch sock et a
et and rope clamp,
nd rope clamp, please
please refer to F
refer to Fig.
ig.
04 – 40.
04 – 40.
Note
Note
Содержание QY30V
Страница 8: ......
Страница 10: ......
Страница 36: ......
Страница 56: ......
Страница 94: ......
Страница 144: ...04 49 04 49 Operation crane superstructure Operation crane superstructure Fig 04 40 Fig 04 40...
Страница 146: ......
Страница 156: ...05 9 05 9...
Страница 158: ......
Страница 170: ......
Страница 202: ......
Страница 242: ...08 39 08 39 M60 M60 66 66 1008 1008 1418 1418...
Страница 244: ......
Страница 272: ...09 27 09 27...
Страница 274: ......