Chapter 6. Description of Operation of Protection Subsystem
M7IRDA2003I
7IRD-A/J/M: Distribution Protection & Control Terminal
© ZIV APLICACIONES Y TECNOLOGÍA, S.L.U. 2020
6-28
Table 6-1: Event Record
Function
Event
oct.
bit
Time and
instantaneous unit
outputs reset and
deactivation [10]
Phase A Time Unit Reset
1
1
Phase B Time Unit Reset
1
2
Phase C Time Unit Reset
1
3
Ground Time Unit Reset
1
4
Phase A Instantaneous (7IRD-A/M) / Instantaneous 1
(7IRD-J) Unit Reset
1
5
Phase B Instantaneous (7IRD-A/M) / Instantaneous 1
(7IRD-J) Unit Reset
1
6
Phase C Instantaneous (7IRD-A/M) / Instantaneous 1
(7IRD-J) Unit Reset
1
7
Ground Instantaneous (7IRD-A/M) / Instantaneous 1
(7IRD-J) Unit Reset
1
8
Phase A Time Output Deactivation
2
1
Phase B Time Output Deactivation
2
2
Phase C Time Output Deactivation
2
3
Ground Time Output Deactivation
2
4
Phase A Instantaneous (7IRD-A/M) / Instantaneous 1
(7IRD-J) Output Deactivation
2
5
Phase B Instantaneous (7IRD-A/M) / Instantaneous 1
(7IRD-J) Output Deactivation
2
6
Phase C Instantaneous (7IRD-A/M) / Instantaneous 1
(7IRD-J) Output Deactivation
2
7
Ground Instantaneous (7IRD-A/M) / Instantaneous 1
(7IRD-J) Output Deactivation
2
8
Phase A Instantaneous 2 Unit Reset (7IRD-J)
3
5
Phase B Instantaneous 2 Unit Reset (7IRD-J)
3
6
Phase C Instantaneous 2 Unit Reset (7IRD-J)
3
7
Ground Instantaneous 2 Unit Reset (7IRD-J)
3
8
Phase A Instantaneous 2 Unit Deactivation (7IRD-J)
4
5
Phase B Instantaneous 2 Unit Deactivation (7IRD-J)
4
6
Phase C Instantaneous 2 Unit Deactivation (7IRD-J)
4
7
Ground Instantaneous 2 Unit Deactivation (7IRD-J)
4
8
Residual current
outputs, open
phase, breaker
failure, coil
supervision and
oscillographic pickup
and activation [11]
Residual Current Pickup
2
1
Residual Current Output Activation
2
2
Open Phase Pickup
2
3
Open Phase Output Activation
2
4
Breaker Failure Output Activation
2
5
Trip Circuit Failure Output Activation
2
6
Close Circuit Failure Output Activation
2
7
Trip Output Failure Output Activation (power #1)
2
8
Close Output Failure Output Activation (power #3)
3
1
Protection Alarm Output Activation (Not in Service)
3
2
Breaker Monitoring
I
2
Alarm Level
3
3
Breaker Monitoring
I
2
Alarm Level Overflow
3
4
Oscillographic Pickup (optional)
3
5
Содержание 7IRD-A
Страница 2: ......
Страница 164: ......
Страница 165: ......
Страница 166: ......
Страница 167: ......
Страница 168: ......
Страница 169: ......
Страница 170: ......
Страница 171: ......
Страница 172: ......
Страница 173: ......
Страница 174: ......
Страница 175: ...D List of Illustrations and Tables...