Page 4 of 40
802005UK - Residential (Boiling),chilled and sparkling installation instructions - Aug 2015 - v2.01
Before installation
• Read the instructions and check if there is adequate space to mount all of the components.
• Note
Not all fittings are supplied with the appliance kit. Isolation valves are not supplied.
• Check the mains water pressure is within min / max requirements (see page 9).
• Check the water quality to determine if extra filtration will be required.
• Note
This product must be fitted to a potable water supply.
• Check the appliance rating plate and ensure correct power is available for the appliance.
• Check the under counter cupboard floor has sufficient strength to support the Command-Centre
TM
when full of water (see page 9 for weights).
Before commissioning
• Check the Command-Centre
TM
has been installed correctly.
• Check all plumbing fittings have been tightened.
• Ensure the outlet and vent pipes are positioned to drain correctly into a sink or font.
• Ensure there is adequate ventilation.
• Check all tubes and pipes from the Command-Centre
TM
to the tap have a constant rise and there
are no sags or kinks in the hoses.
• Check all electrical connections are correct and there are no loose wires.
Commission
(see section 6)
• Flush the supply line before connecting.
• Turn on the gas and water and check for leaks.
• Purge the CO
2.
• Flush the filters (this commences auto calibration for boiling models).
• Activate / enable the booster (if fitted).
• Calibrate the safety sensor (for boiling models).
• Where applicable, programme the Command-Centre
TM
to suit the customer’s requirements.
Installation checklist