Page 18 of 40
802005UK - Residential (Boiling),chilled and sparkling installation instructions - Aug 2015 - v2.01
Installation instructions
Installing the All-in-One 'Mains' tap
1.15 All-in-One ‘Mains’ connections
• Connect the red and clear silicone tubes & USB
cable to the Command-Centre
TM
as shown.
• Connect the blue and white plastic pipe supplied
to the Y connector in place on the end of the blue
silicone tube, then connect to the Command-
Centre
TM
as shown.
• Working from inside the cupboard, attach the
braided hoses to the tube extensions (ensure the
seals on the end of the hoses are lubricated).
Check the correct position for hot and ambient
connections by matching the colours on the
braided hoses with the coloured markings on the
copper extension tubes. (See adjacent diagram).
• The braided hose with the blue markings must be
connected to the ambient mains supply.
• The braided hose with the red markings must be
connected to the hot mains supply.
• Do not over tighten the braided hoses.
• Ensure that all tubes and hoses are firmly
secured.
Clear silicone
tube - VENT on
Command-Centre
TM
Red silicone tube -
BOILING OUT on
Command-Centre
TM
Braided hose with blue
marking - ambient
domestic supply.
Braided hose
with red marking
- hot domestic
supply.
1.14 Base block spider markings and silicone tube positions
(viewed from
underneath).
Blue marking
Red marking
USB cable
Blue silicone tube
Red silicone tube
Clear silicone tube
(see page 31 for Command-Centre
TM
connections)
Braided hose with
blue marking
Braided hose with
red marking
Blue silicone tube
Y connector
blue plastic pipe to-
STILL OUT
white plastic pipe to-
SPARKLING OUT
on the
Command-Centre
TM
RED
CLEAR
BRAIDED
POWER
CABLE
USB
MAINS
IN
MIXER
OUT
MIXER
IN
BOILING
OUT
BYPASS
OUT
VENT BYPASS
IN
BLUE
BRAIDED
CLEAR
CHILLED
OUT
SPARKLING
OUT
CO2
IN