![Zip HydroTap G4 Boiling, chilled sparkling... Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/zip/hydrotap-g4-boiling-chilled-sparkling/hydrotap-g4-boiling-chilled-sparkling_installation-instructions-manual_3845670035.webp)
802005UK - Residential (Boiling),chilled and sparkling installation instructions - Aug 2015 - v2.01
Page 35 of 40
Commissioning
•
Press the [Calibrate] button and the system will
commence the boiling calibration procedure.
This will take approx 5-6 minutes.
•
Upon completion, a booster reminder screen will
appear and allow you to return home by pressing
the [HOME] button.
•
Check the date and time settings (see note
below).
Note
failing to make the correct selection for the booster will affect product performance.
Note
Depending on your location you may need to re-set the internal clock. See section G of the user guide
to check and if necessary, reset the date and time for your time zone.
• Press [START] / [STOP] button to start and stop the filter
flush.
• Open the flush stop cock.
• Allow at least 10 litres of water to flush through the filter.
• Once the filter flush is finished, Close the stop cock then
press [STOP] to end filter flush mode.
• Press [NEXT] for the boiling calibration screen.
OPEN Position
CLOSED Position
ON
OFF
G4 HydroTap Filter Flush Menu
Stop cock
operation
6.5 - Booster
6.4 - Boiling calibration (boiling models)