
Page 12 of 32
802411US v1.27 06.21 BC, BC100-75 Install Instructions
Ventilation
When installing air flow ducts, the following tools will be required:
•
Jigsaw and a 12mm (½”) Drill
•
Keyhole or Wall Board saw.
Cool air IN
Warm air
OUT
Air inlet vent position
Airflow through the cabinet
B
D
Door outlet vent
If the air flow, using the silicone door buffers, is insufficient, it will be necessary to fit a standard HydroTap
vent kit, which ensures heat dissipation through natural convection via installed vents.
For high use applications, where the cabinet space temperature is near 35°C (95°F), or higher, the inlet vent
(See Item B below) and silicone buffers, need to be fitted. If the airflow is still insufficient to maintain normal
operating temperatures then the door outlet vent (See item D below) will need to be fitted.
Alternatively a fan kit may be installed, using the AUX din plug of the right hand side of the appliance
(Contact your local service centre for availability).
Note:
The vent kit has to be installed in a way that allows air to be drawn in from the bottom of the cabinet
and expelled through the top of the cabinet. Therefore placement of the outlet vent should be towards the top
of the door or on the side of the cabinet.
2.3 Alternative Ventilation
1. Drill four pilot holes
12mm (½") dia.
2. Finish the cut-out using
a jig saw and keyhole
or Wall Board saw
Cut-out details
(½")
(11¼")
(2⅜")