
9
Installation instructions & user manual
806143UK V1.00 July 2019 - HydroChill HC45
Technical support
Tel: 0345 6 005 005 Email: [email protected] www.zipwater.co.uk
!
Important
Read this section in conjunction with section 4 Command Centre installation,
page 13.
When installing air flow vents, the following tools will be required
• Jigsaw and drill or equivalent equipment.
• Keyhole or wall board saw.
2.1 Generic requirements
Clearance envelope
•
A clearance envelope around all Command Centres must be provided to allow adequate
ventilation for the safe and effective use of the HydroChill system.
!
550mm
50mm
Command
Centre width
Installation - Section 2 Ventilation
50mm