background image

INSTALLATION AND OPERATING INSTRUCTIONS:

O-ring assembly gripper, pneumatic, GS series

5

Zimmer GmbH 

 Im Salmenkopf 5 

 77866 Rheinau, Germany 

 

 

+49 7844 9138 0 

• 

 +49 7844 9138 80 

 www.zimmer-group.com

EN / 2020-11-30

DDOC00228 / g

Personnel qualification

Installation, commissioning and maintenance may only be performed by trained specialists. These persons must have read 

and understood the installation and operating instructions in full.

5  Product description

5.1  Forces and torques

INFORMATION

For information on the forces and torques for the following component, please refer to our website 

www.

zimmer-group.com:

•  GS series
Please contact Zimmer Customer Service if you have any questions.

5.2  Type plate

A type plate is attached to the housing of the product.
The article number 

am

 and confirmation number 

an

 are shown on the type 

plate. 

XXX

XX-XXXXXX

am

an

6  Function

The product implements the movement sequence for picking up, inserting and wiping when installing O-rings in outer 

annular grooves using two single-action pneumatic cylinders 

in

 

io

.

By using the adjustable expanding stroke, the operator can prevent the O-ring from being overstretched and can ensure 

consistent production quality.
Detecting the end position enables shorter cycle times and continuous control.

im

2-piece piston rod

in

Piston for the spread jaws

io

Piston for the wiper

Содержание GS Series

Страница 1: ...www zimmer group de INSTALLATION AND OPERATING INSTRUCTIONS GS series O ring assembly gripper pneumatic DDOC00228 THE KNOW HOW FACTORY...

Страница 2: ...plate 5 6 Function 5 6 1 Protection class 6 6 2 Technical data 6 7 Installation 7 7 1 General installation information 7 7 2 Installing the mechanical system 8 7 3 Installing the power supply 9 7 3 1...

Страница 3: ...imminent danger to the life and health of people Ignoring these notices can lead to serious injury or even death You absolutely must comply with the described measures for avoiding these dangers The w...

Страница 4: ...ed by qualified specialists in accordance with these installation and operating instructions Make sure that the power cables are disconnected before you install retool maintain or repair the product W...

Страница 5: ...our website www zimmer group com GS series Please contact Zimmer Customer Service if you have any questions 5 2 Type plate A type plate is attached to the housing of the product The article number am...

Страница 6: ...er jaw 2 Stroke setting 3 Power supply 4 Housing 5 Removal jaws 6 Force transmission 7 Drive 8 Integrated slot 9 Mounting and positioning 1 5 8 4 7 9 6 5 8 1 2 3 4 6 1 Protection class NOTICE The prod...

Страница 7: ...t when the power supply is connected Switch off the power supply to the product before all work Secure the power supply against being switched on unintentionally Check the product for any residual ene...

Страница 8: ...NOTICE Non compliance may result in material damage The product is mounted by means of the three tapped holes fn The product is positioned by straight pins in the two fits fo The following work steps...

Страница 9: ...that are available can be found in the accessories list which is available on our website You will also find the necessary ordering information there Use compressed air in accordance with DIN ISO 8573...

Страница 10: ...prevents the complete retraction of the spread jaws in Action on the O ring Grasp the O ring Expand the O ring Positioning for gripping Valve Status Step 1 23456 1 2 3456 12 3 456 123 4 56 1234 5 6 12...

Страница 11: ...orkpiece plunging Position the product above the workpiece in such a way that the upper edge of the spread jaws and the lower edge of the annular groove are aligned with one another Ventilate connecti...

Страница 12: ...with a strength class of 8 8 Observe the permitted tightening torque 1 2 Spread jaws The gripper fingers 9are prepared for installation of the spread jaws 2by inserting the centering sleeves cm Positi...

Страница 13: ...y switch cpby tightening the screws on the mounting block cn cn cp cn cp co 3 4 5 Magnetic field sensor Insert four magnetic field sensors cqinto the corresponding grooves cr Bleed the product complet...

Страница 14: ...crew ct cs Adjustment ring stroke limitation ct Locking screw NOTICE The adjustment ring cscan be turned a maximum of 3 5 revolutions This maximum number of revolutions is only possible when the bleed...

Страница 15: ...hen a product with integrated springs recognizable by the spring symbol on the housing is disassembled this must be done using a device This device should prevent the piston or piston cover from being...

Страница 16: ...ting the product check all power and communication connections as well as all mechanical connections If the product is stored for an extended period the following points are to be observed Keep the st...

Страница 17: ...ents Michael Hoch See manufacturer s address Rheinau Germany 2020 11 15 Martin Zimmer First name last name Address Place and date of issuance Legally binding signature Managing Partner 14 REACH declar...

Страница 18: ...have been used DIN EN ISO 12100 2011 03 Safety of machinery General principles for design Risk assessment and risk reduction DIN EN ISO 4414 Pneumatic fluid power General rules and safety requirement...

Страница 19: ...ATION AND OPERATING INSTRUCTIONS O ring assembly gripper pneumatic GS series 19 Zimmer GmbH Im Salmenkopf 5 77866 Rheinau Germany 49 7844 9138 0 49 7844 9138 80 www zimmer group com EN 2020 11 30 DDOC...

Страница 20: ...ATION AND OPERATING INSTRUCTIONS O ring assembly gripper pneumatic GS series Zimmer GmbH Im Salmenkopf 5 77866 Rheinau Germany 49 7844 9138 0 49 7844 9138 80 www zimmer group com 20 EN 2020 11 30 DDOC...

Отзывы: