![Zeta NPAD Скачать руководство пользователя страница 8](http://html2.mh-extra.com/html/zeta/npad/npad_installation-manual_3522121008.webp)
PREMIER AD INSTALLATION MANUAL.
Software:31/3/04 & LC6
Approved Document No: GLT.MAN-105
PAGE 8
Issue : 1.02 Authorised: GH Date: 15/03/2004
SPECIFIC DEVICE WIRING INSTRUCTIONS:
Fyreye Common Base
FE-CB
80-050
L1
IN
L1
O
UT
EARTH
L2
-R
LOOP + IN
LOOP + OUT
LOOP - IN
LOOP - OUT
Fyreye Loop Isolator Base
FE-IB
80-090
L1
IN
L1
O
UT
EARTH
L2
-R
-
- -
+ +
IN
OUT
LOOP + IN
LOOP + OUT
LOOP - IN
LOOP - OUT
Fyreye Addressable Detector Relay Base
FEA-RB
80-080
L1
IN
L1
O
UT
EARTH
L2
-R
C
LOOP + IN
LOOP + OUT
LOOP - IN
LOOP - OUT
RELAY
OUTPUT
Note that on the Fyreye Loop Isolator Base, the
loop wiring connects to the terminal block on the
PCB and NOT to the Base Spring Screws.
The terminals are & - in,
and +,- &- out.
The second –ve contact can be used
during commissioning to check the loop
integrity.
(Connect the –in to the spare – out.
Repeat for all isolators. Measure –ve line
resistance with a DVM. Return the –in
cable to its original terminal block.)
Zeta Glass Manual Call Point (Resetable)
ZT-MCP/AD (/R)
43-001 (43-002)
LOOP + IN
LOOP + OUT
LOOP - IN
LOOP - OUT
Fyreye Addressable Sounder Base
FEA-SB
80-100
L1
IN
L1
O
UT
EARTH
L2
-R
LOOP + IN
LOOP + OUT
LOOP - IN
LOOP - OUT
Содержание NPAD
Страница 1: ...INSTALLATION MANUAL...