© 2013/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0329-001 Rev F
File Generated July 3, 2013
Page 42
ZS SPAN INSTALLATION MANUAL FOR RAIL-BASED APPLICATIONS - U.S.
Step 5:
Install Array Skirt
Connect First Two Array Skirt Sections Together
5a
Position an Interlock with the Key
side towards the Array Skirt, align-
ing the end of the Array Skirt with
the center mark on the Interlock.
Use the Zep Tool to secure the
Interlock on one side.
Interlock
Array Skirt
i
ii
Rotate the Zep Tool from Position 1
to Position 3.
Do not over-turn.
Attach the second
Array Skirt section,
and tighten the
Interlock on the
second side.
Skirt
will not be flush
at the bottom
until Zep Tool is
fully turned to
Position 3.
Note:
Pre-assemble the first two
Array Skirt sections if the Cam
Foot spacing up the roof is greater
than the length of a single Array
Skirt.
iii
NOTE:
The Interlock includes built-in alignment marks along its top
edge. See
on page 53 for more information.