© 2013/EN Zep Solar, Inc. reserves the right to make specifications changes without any prior notice. All rights reserved.
www.zepsolar.com
Document #800-0329-001 Rev F
File Generated July 3, 2013
Page 51
ZS SPAN INSTALLATION MANUAL FOR RAIL-BASED APPLICATIONS - U.S.
First Module Row, Continued
Tighten Cam Foot base 100 degrees using Flat Tool.
Open position
Closed position
Note positioning of correctly
tightened Cam Foot base.
Secure Cam Foot Base
6h
Attach Cam Foot to Rear Edge of First Module
North-South
drop-in
Flat face of Rockit should be flush
with module frame.
6g
Manually insert the Key side of the Cam Foot into
Zep Groove while aligning Cam Foot base with
Spanner Bar channel.
ii
i
Key side
Do not secure
the Cam Foot
base in the
Spanner Bar yet.