Страница 2: ... height from ground permitted 180 cm 1 INSTALLATION AND DISTANCES 20 20 Distances for installing a single inverter Distances for installing multiple inverters Always wear protective clothing and or personal protective equipment Always consult the manual General notice Important Safety Instructions ...

Страница 3: ...e refer to all pages of this guide except pages 10 to 15 inclusive Note If the 3000SP storage system is to be installed under different conditions from those shown in the diagrams above contact Technical Support to check whether it is feasible Photovoltaic panels Photovoltaic inverter Production meter CT pv sensor CT a sensor Import Export meter Grid connection Utilities Monitoring Critical Loads ...

Страница 4: ...nable Country Change 14 CT Direction 7 Language 13 Set parameters Safety 8 Date and time 2 Event list 1 List of current events 2 List of historical events 5 Energy Statistics Today Week Month Year Life Cycle PV prod PV prod PV prod PV prod PV prod AutoCon AutoCon AutoCon AutoCon AutoCon Export Export Export Export Export Consumption Consumption Consumption Consumption Consumption AutoCon AutoCon A...

Страница 5: ...ity of the battery the excess energy will be exported to the grid Charge When the power of the photovoltaic system is once again less than the power required by the loads the system will use the energy stored in the battery to power the domestic utilities Discharge When the sum of the power produced by the photovoltaic system and supplied by the battery is less than that required by the loads the ...

Страница 6: ...ommunication cable inverter side through the cable gland on the left side of the cover then insert the connector into the CAN port on the inverter s communication board 4 Replace the cover on the inverter and secure it with the four screws then tighten the cable glands Note The communication cable is located inside the kit in the inverter box Communication cable pinout between Pylontech battery 30...

Страница 7: ...ive pole must be connected to the MASTER battery while the cable connected to the inverter s positive pole must be connected to the last SLAVE N battery Inverter negative Inverter positive 3 1 Battery connection Communication cable pinout between Weco battery and 3000SP system from left to right PIN 1 White orange PIN 2 orange PIN 3 white green PIN 4 blue PIN 1 White orange PIN 2 orange PIN 3 whit...

Страница 8: ...f the Slave 1 battery Attention do not connect the RS485 A port to the Master battery In case of additional batteries the communication cable will be connected as indicated above for the connection of the MASTER battery to SLAVE 1 The last battery will only have the RS485 A port connected As for the power connections all the batteries must be connected in parallel using the power cables supplied m...

Страница 9: ...MASTER SLAVE 2 SLAVE 1 MASTER SLAVE MASTER SLAVE 2 SLAVE 1 SLAVE 3 MASTER SLAVE 2 SLAVE 1 SLAVE 3 SLAVE 4 Connecting 5 batteries Connecting 4 batteries Connecting 3 batteries Connecting 2 batteries ...

Страница 10: ...n the inverter board For the extension cable it is recommended to use a category five 8 pole mains cable or a 2x0 5 mm cable In the first case four conductors will be connected to one pole of the sensor and the other four will be connected to the other pole To prevent the conductor wires from breaking it is recommended to use a cable with flexible and non rigid conductors CTa measures the current ...

Страница 11: ... the meter NO Do not read the consumption but the exchanges with the grid INSTALLATION OF SINGLE PHASE SYSTEM PV Inverter Panels 3000SP Batteries Utilities Meter Current sensor CTpv CTa PV Inverter Panels 3000SP Batteries Utilities Meter Current sensor CTpv CTa ...

Страница 12: ...utility Current flow Loads Import Export meter In case of WeCo batteries press the POWER button of each battery for 1 second the RUN LED will turn on and the internal contactor will close automatically Turn on the batteries To turn on Pylontech batteries bring the switch on the front of all the batteries to the ON position Press the red SW button of a single battery for one second the internal con...

Страница 13: ...ystem start the direction depends on the direction of the first current flow FREEZE direction blocked sensors keep the same direction at each start up NOTE Info for writing the password 3000SP System GRID ON To perform the freezing operation follow the instructions below ON Close the AC circuit breaker of the 3000SP system so that it is supplied with AC voltage INSTALLATION OF SINGLE PHASE SYSTEM ...

Страница 14: ...e 4 screws A with a screwdriver Remove the cover B loosen the cable gland C and then remove the stopper G Route the CT cables through the cable glands on the right side of the cover connect the positive and negative cables to the counterpart contained in the inverter kit then insert the counterpart into the corresponding ports on the inverter board For the extension cable it is recommended to use ...

Страница 15: ...of cover and secure it with the four screws then tighten the cable glands ok ok ok INSTALLATION OF THREE PHASE SYSTEM Photovoltaicpanels Photovoltaicinverter CTpv current sensor CTc current sensor CTb current sensor CTa current sensor Batteries L2 Line loads L1 Line loads L3 Line loads Meter L1 L2 L3 Photovoltaicpanels Photovoltaicinverter CTpv current sensor CTc current sensor CTb current sensor ...

Страница 16: ...ent clamp to measure each phase one at a time under the import export meter Current flow Make sure that the AC circuit breaker of the 3000SP system is open and that no AC voltage is present at the ends of the 3000SP 1 Unscrew the 4 screws A of the cover 2 Remove the cover B loosen the cable gland C and then remove the stopper G 3 Pass the AC cable through the cable gland C and connect the phase ne...

Страница 17: ...nt of lower Service Codes contact technical support to receive the updated firmware Enter Pwd 0001 Back Increase number Decrease number Forward or confirm 1 Settings 13 CT Direction Password 0001 Power read by CTa Direction of power flow IMPORT from grid to utility EXPORT from utility to grid Phase shift between voltage and current CTa info CTb info CTc info Indicates the status of the current sen...

Страница 18: ... an alarm will be signalled The sensors or the terminals inserted in the inverter s terminal board will need to be moved until the value of the Power Factor takes on the correct values ON Turn on the photovoltaic system OK OK OK OK OK OK NO OK NO 1 Settings 14 CTpv Scale Factor Password 0001 Scale Factor 1 00 Single phase configuration 3 00 Three phase configuration NOTE The CTpv scale factor is t...

Страница 19: ...ly or in EPS mode if previously enabled 4 Power up the 3000SP by flicking the AC switch up 6 Check that the PV generation value shown on the screen is equal to zero 5 Check that the display shows a withdrawn power value equal to the absorbed power value which can be measured by placing a current clamp under the import export meter 15 CHECKING FOR CORRECT OPERATION OFF ON OFF Waiting time 300 s Err...

Страница 20: ...rk according to the modes described in Chapter 6 Note if the four conditions above are not met check the positioning of the CTs 7 Once the countdown is over the batteries will start to deliver power according to the availability towards the utility trying to reset the consumption from the grid Check that the power of the loads in use does not change Heat pump or pump load variable over time Light ...

Страница 21: ...ge Power factor value Multiplying coefficient of the PV power value read by the CTpv sensor CT direction status Connected battery model and firmware version Total battery capacity in Ah Battery Depth of Discharge DoD and DoDEPS Maximum charge current in A Max voltage value protection Max voltage value charge Maximum discharge current in A Min voltage value discharge Note if there is more than one ...

Страница 22: ...ntry 6 Enable Country Change 4 3 Initial settings Battery 1 Settings 1 Battery parameters 1 Battery type 2 Depth of Discharge 3 Save Password 0001 1 PYLON PYLONTECH 4 GENERAL LITHIUM WECO Depth of discharge 50 EPS depth of discharge 80 After setting the parameters confirm by moving the cursor to Save and press Select the code corresponding to the current legislation in the installation country see...

Страница 23: ...y the inverter in EPS mode given the maximum power of 3 kw that can be supplied in EPS mode Loads with high inrush currents such as pumps compressors or in general devices driven by electric motors may not be supported by the inverter in EPS mode as the inrush current even if only for a very short period is considerably higher than the maximum current that can be supplied by the inverter Inductive...

Страница 24: ... storage inverter 0 00V 230V If the alternating voltage supplied by the grid is present normal operating condition both the standard loads of the system and the critical loads are supplied by the power grid This operation is shown in the figure below It should also be noted that the branch between the LOAD output and the double switch contactor is not energised 20 4 OPERATING MODE NOTE For the con...

Страница 25: ...on will activate the internal switches of the storage inverter which once the set activation time has expired will supply an alternating voltage of 230V with a frequency of 50 Hz on the LOAD output By energising the coils of the double switch contactor this voltage will cause the normally open switches to close and the normally closed switches to open to prevent current being fed back into the gri...

Страница 26: ...22 DATASHEET ...