YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, PA • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
NJEX ZEO Version 04/13/2021
Page 26
Filling the Tank for the First Time
CAUTION: Fill tank to a maximum level of 80% of the tank capacity.
IMPORTANT: If using an existing NJEX odorant tank, a ¼” NPT tee must be
installed under the regulator to supply the blanket gas to the system. See the P&ID
on page 13 for reference.
CAUTION: Odorant has a very strong odor, which if allowed to escape to the
atmosphere, may cause problems in the local community. Take necessary
precautions when filling an odorant storage tank to assure that the local community
is not disrupted during the filling process. Verify that the entire system has no
pressure in it before beginning. Additionally, all personnel should wear protective
clothing, and use equipment as recommended by the chemical manufacturer during
this time. If you are uncertain about any aspect of the odorant itself, you should
contact the manufacturer of your chemical prior to proceeding.
1. Verify correct position of valves before beginning.
-
Open:
V12,
and
V13*
-
Closed:
V10
,
V11
, and
V15
*Note Gas Supply to V13 should
NOT be turned on during this
procedure.
2. Attach inert or natural gas supply
to
V10
.
3. To purge the tank open valve
V10
to introduce inert or natural gas to
the tank to begin displacing any
ambient air from the empty tank.
Continue until pressure on the
gage located directly above
V13
is
observed, then partially open
V11
to allow ambient air from the tank
to begin flowing out. Allow this
process to continue until all
ambient air from the tank is
purged, and only inert gas or natural gas is emitting from this valve, then close
V11
and
V10
. The time required to accomplish this task will vary with the tank size.
4. Vent purge gas by opening
V11
partially until tank pressure reaches just zero, then
close
V11
.
5. Attach odorant supply to
V10
, open
V10
, and begin transferring odorant to the bulk
tank.
6. Connect a line from
V11
to a flare or vapor recovery device, and open
V11
.
Section 3: Filling the Bulk Odorant Tank
Figure 13 Odorant Tank Valves
Содержание NJEX ZEO 6400
Страница 1: ...The NJEX ZEO 6400 7400 8400 9400 Instruction Operating Manual ZERO EMISSIONS ODORIZATION SYSTEM ...
Страница 2: ......
Страница 4: ......