SECTION 5: SYSTEM CONTROL ELECTRONICS
YZ Systems Milton Roy • 201 Ivyland Road • Ivyland, PA • USA • 18974 • P: 281.362.6500 • www.yzsystems.com
NJEX ZEO Version 04/13/2021
Page 59
11.2 - System Venting
Vent the system after purging to equalize pressure within the NJEX ZEO system before
performing maintenance tasks.
11.2.1.
To display the vent maintenance
instructions, press the Select Key from the
Home Screen to open the Main Menu.
Navigate to the Maintenance menu and
press the Select Key. Navigate to the
Vent menu and press the Select Key.
11.2.2. Use the accompanying P&ID in the
cabinet door for referencing valve
locations.
11.2.3.
Follow the Vent instructions on the
screen
or they will be listed below.
11.2.3.1. Open V5
11.2.3.2. Wait until verometer inlet
pressure reaches zero.
11.2.3.3. Begin maintenance
11.2.3.4. After
maintenance
is
complete,
restore
all
connections to the normal
state
11.2.3.5. Confirm all vales are in the position indicated for the Vent mode
11.2.3.6. Close V5
Caution: Vent valve V5 must be closed in all operations excluding venting.
Figure 47 Maintenance - Venting
Содержание NJEX ZEO 6400
Страница 1: ...The NJEX ZEO 6400 7400 8400 9400 Instruction Operating Manual ZERO EMISSIONS ODORIZATION SYSTEM ...
Страница 2: ......
Страница 4: ......