24
3.3
Equipment debugging
After installation, the equipment needs debugging and processing test. Equipment debugging mainly completes
state detection of each module of the machine, including motion module, laser module and electrical I/O module.
3.3.1
Switching sequence
The switching on sequence follows:
Connect master power -> connect fan power -> connect chiller power, start the chiller and set the
temperature properly -> pull up the air switch -> turn the key switch clockwise -> press the laser button
Shutdown in opposite order, successively:
Press the laser button -> turn off the computer -> turn the key switch counterclockwise -> pull down the air
switch -> turn off the chiller and disconnect the chiller power -> disconnect fan power -> disconnect master power
3.3.2
Chiller settings
For the water temperature setting of the chiller, please refer to the Manual of the chiller.
Note
The difference between water temperature of the chiller
and room temperature should be within ±5
℃
.
Attention
Please operate in accordance with the required sequence, or else it may
cause equipment malfunction.