16
Chapter3.
Equipment Installation and
Commissioning
3.1 Equipment Installation
3.1.1
Unpacking Steps
Before installation, disassemble the wooden for the machine in the following steps:
Prize up the packing case of the machine with a crowbar. Unpack in the following order: top cover, left
and right side covers, front and rear side covers, fastening ropes or fixing plate.
Loosen the upper nuts of the feet with a wrench, and raise the feet to make the distance to the pallet
greater than to the casters
Fig.3-1
Loosening Castor and Foot Cup
Fork the machine from the pallet with a forklift, deliver to the destination, and unscrew the feet
Then, unpack the console and water chiller in the same way as unpacking the host / fan.
3.1.2
Unpacking and inspection
After unpacking, check the equipment and auxiliary accessories to ensure that the product isn’t damaged during
transport. Check the contents as follows:
1.
Check equipment model
Please confirm if the model complies with the equipment you have ordered.
2.
Check equipment appearance
Please check if the equipment has defects such as scratch, damage, deformation and corrosion.
Note
Refer to the machine for the packaging.