background image

 

22 

Fig.3-7

 

Power Outlet 

 

L: 220V mains system phase line; must be equipped with safety electrical switch (switch must be 
installed in the phase line). 

 

N: commonly known as the neutral line, supply power to the equipment with the phase line. 

 

E: earth wire; the enclosures (earth terminals) of all electrical equipment are connected to this wire to 
ensure safety. Resistance to earth should be 

less than 5Ω.

 

 

The user must consult professional electrical installer (electrician), and ask the electrician to check and 

ensure that the earth wire is securely connected! 

 

 

 

If the power supply system does not have earth wire, ask the electrician to install grounding grid according to the 

following method: 

 

The grounding device must be knocked into a humid place around the house with 2-4 pieces of 
4×35×1500mm angle steel, the distance between each other is 1m, then lead each piece of angle steel 
out of the earth with 3×30mm flat iron and form a grounding grid. 

 

Lay the ground grid properly, and measure its resistance to ground with the instrument (standard 
resistance: 3-5 ohms). 

 

The machine is equipped with a piece of RVV2.5mm2 yellow-green copper wire, of which one end is 
connected to the grounding line terminal and the other end is connected to the earth wire of the 
etching machine, as shown below: 

 

3*30 Flat steel     

Ground   

4*35*1500 angle steel 

Fig.3-8

 

Equipment Grounding Diagram 

 

Attention

 

Improper grounding can cause high failure rate, and may lead to other accidents! 
The Company assumes no responsibility and obligation for such failures and 
accidents 

 

 

 

1m 

1m 

1m 

Содержание MC180-D-A

Страница 1: ...I Product Manual Laser Marking Machine Applicable model MC180 D A Version 1 0...

Страница 2: ...r consequential damage or liability caused by improper use of this manual or the product Han s Yueming Laser owns the patent copyright or any other intellectual property right of this product and the...

Страница 3: ...ncluding but not limited to add remove modify unauthorized disassembly replacing parts 2 Use the machine in the environment failing to satisfy the operating requirements 3 Operate disobeying the speci...

Страница 4: ...o not have the functions listed in this manual Please refer to the specific functions for details Due to the constantly tech update the specification for reference only subject to the real standard Ta...

Страница 5: ...hibited Reliable earthing is required for the machine and related other machine before power on During operating removing any cover of the machine is strictly prohibited During operating the operators...

Страница 6: ...xiliary accessories 5 1 2 Equipment Parameters 6 1 3 Product Configuration 7 1 4 Operating environment 7 1 5 Suitable materials 8 1 6 Application 8 Chapter2 Safety Rules 9 2 1 Product safety 9 2 2 Saf...

Страница 7: ...mputer display and keyboard and mouse 19 3 1 5 Installing fan and water chiller 20 3 1 6 Equipment grounding 21 3 2 Equipment button instruction 23 3 3 Equipment debugging 24 3 3 1 Switching sequence...

Страница 8: ...chiller maintenance 35 4 4 3 Work platform maintenance 35 4 5 Auxiliary equipment maintenance 36 Chapter5 Troubleshooting 37 Chapter6 Appendix 38 6 1 Electrical Control System Block Diagram of Main Po...

Страница 9: ...mm Matts honeycomb panel and fine blade panel are optional for working platform to meet the process requirements of different customers Excellent semi enclosed design and hydrodynamic design removing...

Страница 10: ...t shall prevail 1 1 1 Overall Components The front view of the machine is as shown in Fig 1 1 Fig 1 1 Front View Optical path marking system Water chiller Table including lower ventilation Lifting sys...

Страница 11: ...ion Mechanism Diagram 1 1 3 Optical system composition In addition to the standard configuration 180W laser with three axis dynamic galvanometer of 9mm light path as shown in Fig 1 4 of MC180 D A mark...

Страница 12: ...without electric focusing as shown in Fig 1 6 Fig 1 4 Standard Configuration Diagram of Optical Mechanism Laser Reflector 1 Reflector 2 Three axis dynamic galvanometer Fig 1 5 Optional Configuration...

Страница 13: ...Beam expander 1 1 4 Auxiliary accessories To ensure proper operation the laser equipment also needs some auxiliary accessories such as fan and water chiller Different models have different auxiliary a...

Страница 14: ...he total input power of the equipment typically AC 220V export models vary by country Total Power The rated power of the equipment while operating Manufacturing No a unique number of each machine Date...

Страница 15: ...e 10 Computer Qitian M4360 1 Lenovo English Win7 Professional Edition is optional 11 PC software SmartScanner 1 Han s Yueming SmartScanner dongle WD9 Auxili ary equip ment 12 Water chiller CW 6100AN 1...

Страница 16: ...ference device or radio transmitter around 1 5 Suitable materials Textile fabrics leather carving and marking Plastic material marking 1 6 Application Clothing accessories footwear industry rubber pro...

Страница 17: ...maintenance regulations of the machine 2 2 Safe equipment Safety equipments are used for protecting personnel and unauthorized disassembly bridge group or by pass connection are strictly prohibited i...

Страница 18: ...ning for machine and electric engineering The maintenance personnel are responsible for daily maintenance of the machine and repair at low level if needed Training on the maintenance personnel contain...

Страница 19: ...beam Generally observation of diffuse reflection is safe Class 4 laser device with diffuse reflection causes danger They may possibly cause skin burn or fire accident Great care is required to use thi...

Страница 20: ...of electric shock Note Wavelength of CO2 laser device of this class is 10 6 m and it is a class 4 laser device You are recommended to use SD 5 type of protective glasses made by Shield Company Attent...

Страница 21: ...outgrowth may possibly generate and their hazard must satisfy the requirements specified in Appendix A for example of processing outgrowth as national standard GB 18490 2001 laser processing machine...

Страница 22: ...material In normal condition these optical parts are free of danger However polluted focus or focus with damaged coating will cause thermal reducing by laser beam over 400 the xic smoke is generated A...

Страница 23: ...njury the followings should be performed Stop hurting e g stop the machine disconnect the power supply It is a must to take first aid measures Notify professional medical personnel Notify the competen...

Страница 24: ...an to the casters Fig 3 1 Loosening Castor and Foot Cup Fork the machine from the pallet with a forklift deliver to the destination and unscrew the feet Then unpack the console and water chiller in th...

Страница 25: ...Personnel The equipment must be installed by our professional service personnel If the customer wants to install the machine the installer must have received the full installation training and have ma...

Страница 26: ...e light path has been adjusted then put the spirit level along the line between the upper left corner and lower right corner of the laser cavity observe and adjust the foot cups in the same way put th...

Страница 27: ...frame of the monitor and connect to the keyboard mouse adapter wire in the chassis Take out the computer and put it on the mounting board and connect the wires to appropriate ports of the computer as...

Страница 28: ...adapter USB cable Ethernet cable Fig 3 5 Computer Host Wiring Diagram 3 1 5 Installing fan and water chiller Fill up the industrial chiller with distilled water or deionized water Connect the fan wate...

Страница 29: ...ater outlet connected to Main power interface Chiller flow protection interface Footswitch interface Fig 3 6 Fan and Chiller Connection Diagram 3 1 6 Equipment grounding MC180 D A laser equipment has...

Страница 30: ...ng method The grounding device must be knocked into a humid place around the house with 2 4 pieces of 4 35 1500mm angle steel the distance between each other is 1m then lead each piece of angle steel...

Страница 31: ...ressed down the LED is on and laser emits Emergency stop switch located on the main stand of the monitor when the emergency stop button is pressed down the system power won t be cut off RF laser is pr...

Страница 32: ...switch turn the key switch clockwise press the laser button Shutdown in opposite order successively Press the laser button turn off the computer turn the key switch counterclockwise pull down the air...

Страница 33: ...rking Distance Adjusting Diagram If the marking range is 600mmX600mm the working distance is 660mm if the marking range is 300mmX300mm the working distance is 350mm if the distance is too short or too...

Страница 34: ...f the laser path changes according to laser path calibration 1 and laser path calibration 2 according to section 3 3 3 1 3 If there are any changes adjust the laser path according to section 3 3 3 1 2...

Страница 35: ...ment bolt A clockwise and the reflector will rotate around axis X outward i e the light moves in the negative direction of axis Y Whether the optical path is adjusted properly can be determined by tar...

Страница 36: ...or 1 if not After the incident light passes through the center of the light inlet of the galvanometer on the rear panel another point needs to be identified to ensure the correct optical path and thus...

Страница 37: ...ent Parameters 2 The galvanometer has a vernier caliper connected to the dynamic axis First loosen the screws on the calipers push the calipers to the zero position far left then click Mark and move t...

Страница 38: ...ssed Set the processing parameters layer parameters and the related data process such as path optimization Move the marking system to the starting point of processing search for the starting point Sta...

Страница 39: ...locker After running 1 2 months if in harsh environments or the processed materials are dusty the dust clean up period should be once a week blow and clean the electric control box with clean dry air...

Страница 40: ...bled and cleaned of course shall be made in a certain way to avoid damage to the lens and further pollution General Operation Principles In the installation and cleaning process of lens any sticky mat...

Страница 41: ...shaking the container which fill with polish open the container dropout 4 or 5 drops Drop in cotton ball move the cotton ball as draw circle path when process please do not press the cotton ball cont...

Страница 42: ...mirror cleaning the lens wiping paper folded several times with a cleaning fluid anhydrous ethanol dip dip in with the presence of water ethanol wipe mirror paper with spiral linear graze focus lens f...

Страница 43: ...llowing steps 1 Turn off the laser power and stop the machine 2 Unscrew the drain valve of the water chiller and drain the cooling water from the water chiller 3 Open the protective cover of the water...

Страница 44: ...he honeycomb plate into the scrap collection drawer of the work platform with an air gun and discard the scraps from the collection drawer 4 5Auxiliary equipment maintenance Item Maintenance Cleaning...

Страница 45: ...r isn t powered on Check if the water chiller is turned on Optical path is sheltered Check the optical path Control card driver is not installed properly Install the hardware drivers according to the...

Страница 46: ...er input AC220V 50Hz Monitor Cooling fan Switching power supply G1 24VDC A1 Three axis dynamic High power intermediate relay KA1 Switching power supply G2 24VDC A2 RF laser AC contactor KM1 U1 USB mar...

Страница 47: ...on our machines without notice to users The above icon is the registered trademark of Han s Yueming Company Copyrights belong to Han s Yueming Group Co Ltd It is forbidden to pirate or copy any part o...

Отзывы:

Похожие инструкции для MC180-D-A