152
YORK INTERNATIONAL
FORM 150.52-NM2 (1001)
Maintenance
PROCEDURE
WEEKL
Y
QUARTERL
Y
S
EMI-ANNUALL
Y
YEARL
Y
EVER
Y
___ HOURS
Check oil level in oil separator sightglass
X
Check liquid line sightglass / moisture indicator
X
Record system operating pressures and temperatures
X
Check programmable operating setpoints and safety cutouts
X
Check condenser coils for dirt/debris and clean if necessary
X
Check compressor and cooler heater operation
X
Check suction superheat at compressor;
X
Check condenser subcooling
1
Leak check the chiller
1
X
Sample compressor oil and replace if necessary
1
X
Disconnect power source and lock out; Check tightness of
X
power wiring connections
1
Perform a top head maintenance
1
Note 2
Note 2
MAINTENANCE REQUIREMENTS FOR YORK YCAR RECIP CHILLERS
1.
This procedure must be performed at the specified time interval by an Industry Certified T
echnician who has been trained and
qualified to work on this type of YORK equipment. A record of this
procedure being successfully carried out must be maintained on file by the equipment owner should proof of adequate maintenance
be required at a later date for warranty validation purposes.
2.
T
o
maintain peak reliability
, helical coil springs used in reciprocating compressor suction and discharge valve assemblies sh
ould be replaced as per the recommended interval. See specific
compressor maintenance recommendations found in the compressor maintenance manual.