66
IM 767361-01E
Troubleshooting, Maintenance, and Inspection
8. You will return to the screen in step 5. Select the next calibration point and
press
ENTER/LOCAL
. Once you have entered the three points, select
, then press
ENTER/LOCAL
.
9. The three calibration points are calculated per the correction factor, and
written to the EEPROM. When the calibration has been successfully
completed,
is displayed and you are returned to the screen in step
4. To return to the normal measurement screen, select
then press
ENTER/LOCAL
.
Procedure (Using Communications Commands)
Please see the sample program on page App-17 to App-18.
Note
Set the value of the current calibration point to the current value which was converted form
the voltage value read out by the digital multimeter.
Recommended Replacement Parts
We recommend periodic replacement so that you will be able to use the MT210/
MT210F/MT220 for a long period of time. Contact your nearest YOKOGAWA
dealer for replacement parts.
Parts Name
Part No.
Replacement Period
EL panel (for backlight)
B9320TN
Approx. 5000 hours under continuous use
Lithium battery
A1096EB
Approx. 5 years
Replacing the Fuse
WARNING
• To prevent fire, only use a fuse of the specified rating. Never use a fuse
of any other rating and never short-circuit the fuse holder to bypass the
fuse.
• Never operate the instrument if you have any reason to suspect any
defect or problem with the fuse.
• Before replacing the fuse, be sure to turn the POWER and MAIN
POWER switches OFF, remove the connections from each input and
output terminal, and remove the power cord from the AC outlet.
French
AVERTISSEMENT
• Afin d’éviter tout risque d’incendie, utilisez uniquement un fusible de la
cote spécifiée. N’utilisez jamais de fusible d’
une autre cote et ne mettez
jamais le porte-fusible en court-circuit pour contourner le fusible.
• Ne faites jamais fonctionner l’instrument si, pour quelque raison que ce
soit, vous suspectez un défaut ou un problème du fusible.
• Avant de remplacer le fusible, assurez-vous de mettre hors tension les
interrupteurs POWER et MAIN POWER, de retirer les branchements de
chaque borne d’entrée et de sortie, et de retirer le cordon d’alimentation
de la prise secteur.
end of calibration
calibration
executed correctly