<7. Maintenance>
7-2
IM 11R02A01-02E
5th Edition : Dec. 28, 2016-00
7.2 Regular Check
Refer to Figure 3.2 , 3.3 and 3.4. The flow sheet depends on the specification.
7.2.1
Cleaning of the Orifice Plate and Replacement of
O-ring
When something like dust adhere to the orifice holes, the output declines.
Follow the instruction as below to clean.
O-RING (P16)
ORIFICE
PLATE
COVER
PLATE
HEX. HOLE SCREW
ORIFICE
ASSEMBLY
HOLDING
SCREW
O-RING (P20)
F10-2.ai
CROTCHET JOINT
Figure 7.2 Orifice System
1) Suspend the supply of the sample gas, then blow the gas line with the air.
2) Remove the crotchet joint.
3) Turn the holding screw and take out.
4) Pull out slowly to the direction as shown on Figure 10.2.
5) Loosen the set screw by using the hexagonal wrench attached to take out the orifice plate
together with the cover plate. The following is part number of the orifice plate.
Orifice hole (Ø)
Part number
Orifice hole (Ø)
Part number
0.35
G7025XJ
0.80
G7034XJ
0.40
G7026XJ
0.85
G7035XJ
0.45
G7027XJ
0.90
G7036XJ
0.50
G7028XJ
1.0
G7037XJ
0.55
G7029XJ
1.1
G7038XJ
0.60
G7030XJ
1.2
G7039XJ
0.65
G7031XJ
1.3
G7040XJ
0.70
G7032XJ
1.4
G7041XJ
0.75
G7033XJ
1.5
G7042XJ
6) For the cleaning use something like a supersonic cleaner and never insert into the orifice
holes anything like a stick or rod.
7) When the O-rings are worn out, replace them with the spare parts. Part number of O-rings
are Y9114XB (P16) and L9817MT (P20).
8) After the cleaning and replacement are completed, assemble the parts in the reverse order
of the disassembly as mentioned above.
Содержание CM6G
Страница 1: ...User s Manual Model CM6G Gas Calorimeter IM 11R02A01 02E IM 11R02A01 02E 6th Edition ...
Страница 5: ...Blank Page ...
Страница 19: ...Blank Page ...
Страница 25: ... 2 Installation Piping Wiring 2 6 IM 11R02A01 02E 5th Edition Dec 28 2016 00 ...
Страница 63: ...Blank Page ...