22
5000-015C ASSEMBLY INSTRUCTIONS / PART ID
GERINGHOFF 8 ROW
Step 1:
Install each 5000-227 single mount using 2) 5000-
348 mount straps, 4) 5/8” – 11 X 7” bolts, & 4) 5/8” – 11 lock nuts.
Insert the 2 top mounting bolts through the 5000-228 support strap before going through the face plate of the mount. Install 1)
5/8” – 11 X 2 ½” bolt through open end of the support strap securing to the mating hole on the mount bracket with a 5/8” whiz
lock hex nut. Mount bracket locations will be between rows 1 & 2, 2 & 3, 3 & 4, 5 & 6, 6 & 7, and 7 & 8. Install the 5000-323
lock up pin in the storage location & secure each in place with 2) 7 gauge cotter hairpin.
NOTE: ON CERTAIN 8 ROW GERINGHOFF CORN HEADS, THE HYD. CYLINDER & SPRING ASSIST FOR THE DECK
PLATE ADJUSTMENT WILL NEED MOVED. APPROXIMATELY 1FT OF HYD. HOSE WILL NEED ADDED TO REACH THE
CYLINDER’S NEW LOCATION. CALL YETTER FOR MORE INFO, 1-800-447-5777, & ASK FOR SERVICE DEPARTMENT!
Step 2:
Install 1) 5000-318 pivot bushing in each single mount. Attach 1) 5000-256 LH over bearing arm to the single
mount between rows 2 & 3 and 7 & 8. Install 1) 5000-259 RH over bearing arm to the single mount between rows 1 & 2
and 6 & 7. Install the 5000-241 wide centered fixed pivot arm to the mount between rows 3 & 4 and 5 & 6. Align the
lower hole on each arm with the pivot bushing and insert a 5/8” X 3” bolt through & fasten with a 5/8” lock nut.
Step 3:
Install 1) 2570-
126 ¾” X 10” eyebolt to each single mount. Attach each over bearing arm to each eyebolt using 1) 2510-
121 5/8” diameter shoulder bolt, 2) 2526-449 5/8” flat washers, & 1) 2520-364 ½” jam lock nut. The 5/8” flat washers go on each
side of the eyebolt & inside the arm channel. The shoulder bolt should be inserted through the top hole on each arm. Only tighten
the ½” jam lock nut until it makes slight contact with the over bearing arm.
Step 4:
Install the 2550-709 compression spring over each eyebolt, place the 2975-302 spring bushing over the eyebolt & onto the
compression spring, & secure with the 2520-
511 ¾” lock nut. Tighten the lock nut to be flush with the end of the eyebolt.
Step 5:
Install each 3 row roller mount. For rows 1
– 3, slide the roller mount into place between the plates on the over bearing
arm between rows 1 & 2 and 2 & 3. Use 2) 5000-378 spacer bushings, 2
) ½” X 3 ¾” bolts, & 2) ½” lock nuts to attach the roller
mount tube to each arm clamp. Repeat this process to attach the roller mount for rows 6
– 8 using the over bearing arm between
rows 6 & 7 and 7 & 8. Do not tighten each roller mount into place until after the roller is installed so you can center the roller if
needed. Make sure the bearing support is on the back side of the roller mount tab.
Step 6:
Attach each roller to the roller mount using 2) 5000-322 shim washers, 2) 5000-
355 bearing assemblies, 6) ½” X 2 ½”
bolts, & 6) ½” lock nuts per roller.
NOTE: BEARING HOUSING SHOULD BE LUBRICATED WITH POLYUREA GREASE BEFORE USE AND THEN EVERY 100 HOURS OF OPERATION
Содержание 5000-005B
Страница 40: ...40 2565 771_REV_I 01 2024...