5.15 Method 1: Copy One Subtask Job and Create Other Two Jobs
5-31
Calculation by Teaching
4
Press [ENTER].
The shift value is set.
Operation
Explanation
1
Display the PARALLEL SHIFT
JOB window.
2
Select “TEACH SETTING” in
the item of “BASE POINT.”
3
Select “BASE POINT(SRC).”
4
Move the manipulator to the
original base point by the axis
keys.
Operation
Explanation
R1:X
Y
Z
200.000
0.000
0.000
PARALLEL SHIFT JOB
SOURCE JOB
STEP SECTION
DESTINATION JOB
COORDINATES
BASE POINT
<SHIFT VALUE>
EDIT
DISPLAY
UTILITY
DATA
Short Cut
Main Menu
CANCEL
EXECUTE
R1:X
Y
Z
0.000
0.000
0.000
R1:X
Y
Z
0.000
0.000
0.000
PARALLEL SHIFT JOB
EDIT
DISPLAY
UTILITY
DATA
Short Cut
Main Menu
CANCEL
EXECUTE
140/210