7.1 Flow of Trial Operation
7.1.2 Flow of Trial Operation for Linear Servomotors
7-3
7
T
rial Operation and Actual Operation
7.1.2
Flow of Trial Operation for Linear Servomotors
The procedure for trial operation is given below.
T
ri
a
l Operati
o
n
8
Trial Operation with the Servomotor Con-
nected to the Machine
7.5 Trial Operation with the Servomotor Connected to
the Machine
Continued from previous page.
Step
Meaning
Reference
To power
s
upply
CN1, to ho
s
t controller
S
ecure the motor flange to the
machine, and connect the
motor
s
haft to the load
s
haft
with a coupling or other mean
s
.
S
Step
Meaning
Reference
Pr
ep
ara
tion
s
for T
ri
a
l Ope
rati
o
n
1
Installation
Install the Servomotor and SERVOPACK
according to the installation conditions.
First, operation is checked with no load.
Do not connect the Servomotor to the
machine.
Chapter 3 SERVOPACK Installation
2
Wiring and Connections
Wire and connect the SERVOPACK. First,
Servomotor operation is checked without
a load. Do not connect the CN1 connec-
tor on the SERVOPACK.
Chapter 4 Wiring and Connecting SERVOPACKs
3
Confirmations before Trial Operation
7.2 Inspections and Confirmations before Trial Opera-
tion
4
Power ON
−
Continued on next page.