2-17
SPEC
CABLE ROUTING DIAGRAM
A
Install the brake hose so that its pipe portion
directs as shown and lightly touches the
projection on the master cylinder.
B
Pass the “ENGINE STOP” button lead in
the middle of the clutch holder.
C
Pass the clutch cable in front of the throttle
cable.
D
Clamp the “ENGINE STOP” button lead to
the handlebar to 3 clicks.
E
Pass the brake hose in front of the number
plate and through the cable guide.
F
Cross the clutch cable and throttle cable
over the number plate boss.
1
Brake hose
2
Master cylinder
3
“ENGINE STOP” button lead
4
“ENGINE STOP” button
5
Throttle cable
6
Clutch cable
7
Clamp
8
Cable guide
Содержание YZ 2002 Series
Страница 128: ...3 3 INSP ADJ MEMO ...
Страница 286: ...4 37 ENG CLUTCH AND PRIMARY DRIVEN GEAR 4 Install 9Plain washer 1 9Circlip 2 ...
Страница 566: ...TUN MEMO ...
Страница 567: ......