CHAPTER 5 Installation
5-10
4-2
Replacement of Y axis belt (YP330X, YP340X)
1) Turn off the controller power.
2) Remove the robot Y axis cover.
3) Place marks(with a marker etc.) on the pulleys before replacement to limit
deviations in point data occurring due to the belt replacement. (Fig. 5-4)
4) Loosen the tension on the belt and remove the belt.
5) Place the new belt on the pulley lining it up with the marks (for synchroniz-
ing the positions of the two pulleys) you made in step 3) above.
6) Adjust the belt tension and set the origin position again by absolute reset.
(See Chapter 4.)
7) Make corrections if any point data has deviated.
Pulley
belt
Pulley
Fig. 5-6 Belt replacement
Содержание YP-X Series
Страница 1: ...OWNER S MANUAL ...
Страница 2: ......
Страница 6: ...MEMO ...
Страница 10: ...MEMO ...
Страница 12: ...MEMO ...
Страница 29: ...CHAPTER 2 Functions 1 P P robot unit 2 1 2 P P robot controller 2 2 ...
Страница 30: ...MEMO ...
Страница 34: ...MEMO ...
Страница 42: ...CHAPTER 3 Installation 3 8 Robot Cable DRCX YP320X Fig 3 5 Robot cable connections ...
Страница 46: ...MEMO ...
Страница 56: ...4 10 MEMO ...
Страница 58: ...MEMO ...
Страница 82: ...MEMO ...
Страница 109: ...MEMO ...