CHAPTER 4 Installation
4-7
3-2
Adjustment of Z axis tip belt tension (YP320X, YP320XR, YP330X,
YP340X)
1) Turn off the controller power.
2) Remove the robot Z axis cover.
3) Loosen the bolt securing the belt tensioner as shown in Fig. 4-3 and loosen
the belt.
4) Insert a slotted screwdriver into the clearance between the X axis plate and
the belt tensioner, and then lever the screwdriver to apply tension to the belt.
5) Apply a load of 0.5 kgf to the center section of the belt for fixing the belt
tension. A slack of approximately 2mm is satisfactory.
6) If the belt tension in now satisfactory, tighten the bolts securing the belt
tensioner.
7) Install the Z axis cover for the robot.
Approx.2mm
Load 0.5kg
Belt tensioner
Z-axis plate
Securing bolt
Fig. 4-3 Belt tension
Содержание YP-X Series
Страница 1: ...OWNER S MANUAL ...
Страница 2: ......
Страница 6: ...MEMO ...
Страница 10: ...MEMO ...
Страница 12: ...MEMO ...
Страница 29: ...CHAPTER 2 Functions 1 P P robot unit 2 1 2 P P robot controller 2 2 ...
Страница 30: ...MEMO ...
Страница 34: ...MEMO ...
Страница 42: ...CHAPTER 3 Installation 3 8 Robot Cable DRCX YP320X Fig 3 5 Robot cable connections ...
Страница 46: ...MEMO ...
Страница 56: ...4 10 MEMO ...
Страница 58: ...MEMO ...
Страница 82: ...MEMO ...
Страница 109: ...MEMO ...