ENG
CYLINDER HEAD
7
Timing adjusting plug
1
8
Screw
1
9
Timing chain tensioner cap bolt
1
10
Timing chain tensioner / gasket
1/1
11
Breather plate
1
12
Camshaft sprocket / guide pin
1/1
Refer to “REMOVING THE
13
Cylinder head assembly
1
CYLINDER HEAD” and
14
Timing Chain guide (front)
1
“INSTALLING THE CYLINDER
15
Dowel pins
2
HEAD”
16
Cylinder head gasket
1
For installation, reverse the
removal procedure
Job/Part
Qt’y
Remarks
Order
5-8
E
C
G
F
1
3
60 N.m (6.0 kgf.m, 44 ft.lb)
B
8
A
10 N.m (1.0 kgf.m, 7.2 ft.lb)
2
18 N.m (1.8 kgf.m, 13 ft.lb)
4
0
9
7,5 N.m (0.75 kgf.m, 5.5 ft.lb)
7
6
22 N.m (2.2
kgf.m, 16
ft.lb)
20 N.m
(2.0 kgf.m,
14 ft.lb)
5
10 N.m (1.0 kgf.m, 7.2 ft.lb)
10 N.m (1.0 kgf.m, 7.2 ft.lb)
New
New
New
New
New
New
New
Содержание YBR250 2007
Страница 1: ...YBR250 SERVICE MANUAL 5D1 F8197 E0 2007 ...
Страница 2: ......
Страница 359: ...YAMAHA MOTOR DA AMAZÔNIA LTDA ...