4-31
FUEL
E
OIL PUMP
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
OIL PUMP HOSES AND CABLE
REMOVAL
Follow the left “Step” for removal.
1
Bleed hose
1
2
Air bleed screw
1
3
Gasket
1
4
Bleed hose stay
1
5
Oil delivery hose 1
3
6
Oil delivery hose 2
3
7
Check valve
3
8
Oil pump cable
1
Reverse the removal steps for installation.
Содержание XLT1200 WaveRunner 2003
Страница 192: ...5 10 POWR E MUFFLER ASSEMBLY SERVICE POINT Catalyst inspection 1 Inspect Catalyst Cracks damage Replace ...
Страница 518: ...E TRBL ANLS CHAPTER 9 TROUBLE ANALYSIS TROUBLE ANALYSIS 9 1 TROUBLE ANALYSIS CHART 9 1 ...
Страница 530: ......
Страница 531: ...Printed in Japan Jan 2001 0 3 1 CR F0V 28197 2D C1 XA1200A Z YAMAHA MOTOR CO LTD Printed on recycled paper ...