COOLING WATER REPLACEMENT
3-7
3. Disconnect:
• Radiator hose 2
1
4. Remove:
• Radiator cap
Drain the cooling water completely.
5. Clean:
• Cooling system
Thoroughly flush the cooling system with
clean tap water.
6. Connect:
• Radiator hose 2
T
2 Nm (0.2 m
d
kg, 1.4 ft
d
lb)
7. Fill:
• Radiator
• Engine
To specified level.
Recommended cooling water:
Soft water
Cooling water capacity:
1.4 L (1.23 Imp qt, 1.48 US qt)
2
CC
CAUTION:
• When filling the radiator with anti-freeze,
tilt the motorcycle so that the filler hole
b
b
is at the highest position. If the radiator is
positioned upright, air
a
a
is difficult to
escape which may result in excessive
engine heating.
• Hard water or salt water is harmful to the
engine parts. You may use distilled water,
if you can’t get soft water.
8. Remove:
• Air bleeding bolt (right cylinder)
1
Bleeding the air until coming out the cooling
water.
9. Install:
• Air bleeding bolt (right cylinder)
T
12 Nm (1.2 m
d
kg, 8.7 ft
d
lb)
10.Fill:
• Radiator
• Engine
To specified level.
11. Install:
• Radiator cap
Start the engine and warm it up for a sever-
al minute.
INSP
ADJ
Содержание TZ250M1
Страница 1: ...5KE 28199 10 LIT 11626 13 41 OWNER S SERVICE MANUAL TZ250M1 M...
Страница 11: ...MEMO...
Страница 15: ...CHAPTER 7 TUNING ENGINE 7 1 CHASSIS 7 14...
Страница 287: ...99 9 0 1x1...