60H5E11
7
Checking the reservoir and gear pump
unit
1. Clean all the valves, pistons, balls, and fil-
ters. Check them for damages or wear.
Check the gear pump for damages or wear.
Replace them if necessary.
60h70680
Assembling the reservoir and gear
pump unit
Reinstall the components and parts in their
original direction and position.
1. Install a new O-ring
1
, the up-relief valve
seat
2
, balls
3
, and absorber valve pin
4
, and spring
5
on the pump housing.
60h70690
2. Install new O-rings
6
on the main valves
7
. Then, attach them on the pump hous-
ing.
60h70700
3. Install the gear pump
8
.
60h70710
4. Install the balls
9
, shuttle pistons
0
, and
balls
A
into the gear pump cover.
60h70720
NOTE:
Apply grease to the balls and shuttle pistons
to prevent them from falling out of the gear
pump.
PTT motor and Reservoir
7-30
Содержание 200A
Страница 1: ...200A L200A 60H 28197 5E 11 290446 SERVICE MANUAL ...
Страница 60: ...60H5E11 Fuel system FUEL 4 1 Special service tools Vacuum pressure pump gauge set 90890 06756 ...
Страница 237: ...60H5E11 8 Rear view 60h80045 1 Ignition coil 2 Spark plug 3 CDI unit 1 2 3 8 6 Electrical components ...
Страница 277: ...60H5E11 W Wiring harness 8 7 i 4 ...
Страница 279: ...200AET L200AET ...
Страница 280: ......
Страница 281: ...Printed on recycled paper Printed in Japan Feb 2002 0 9 1 200AET L200AET E YAMAHA MOTOR CO LTD ...