
5 - 48
ENG
BELT DRIVE
2. Tighten:
• clutch shoe assembly nut
1
NOTE:
_
While holding the clutch shoe assembly with
the rotor holding tool
2
, tighten the clutch
shoe assembly nut with the locknut wrench
3
.
3. Install:
• clutch housing
1
• collar
• secondary sheave nut
2
NOTE:
While holding the clutch housing with the
sheave holder
3
, tighten the secondary
sheave nut.
Rotor holding tool
90890-01235, YU-01235
Locknut wrench
90890-01348, YM-01348
Sheave holder
90890-01701, YS-01880-A
1
2
3
T
R
.
.
90 Nm (9.0 m · kg, 65 ft · lb)
3
2
1
T
R
.
.
60 Nm (6.0 m · kg, 43 ft · lb)
4. Install:
• V-belt
• primary fixed sheave
• collar
• primary sheave nut
NOTE:
• Install the V-belt onto the primary sheave
1
(when the pulley is at its widest position) and
onto the secondary sheave assembly
2
(when the pulley is at its narrowest position),
and make sure the V-belt is tight.
• While holding the primary fixed sheave with
the rotor holding tool, tighten the primary
sheave nut.
Rotor holding tool
90890-01235, YU-01235
T
R
.
.
83 Nm (8.3 m · kg, 60 ft · lb)
2
1
Содержание 2004 YP400
Страница 1: ...2004 YP400 S 5RU1 AE1 SERVICE MANUAL ...
Страница 2: ......
Страница 8: ......
Страница 9: ...GEN INFO 1 ...
Страница 11: ...GEN INFO ...
Страница 28: ...SPEC 2 ...
Страница 30: ...SPEC ...
Страница 50: ...2 20 SPEC Camshaft cap tightening sequence Cylinder head tightening sequence TIGHTENING TORQUES ...
Страница 77: ...CHK ADJ 3 ...
Страница 137: ......
Страница 138: ...CHAS 4 ...
Страница 210: ......
Страница 211: ...ENG 5 ...
Страница 286: ...COOL 6 ...
Страница 288: ...COOL ...
Страница 299: ...FI 7 ...
Страница 301: ...FI ...
Страница 342: ...ELEC 8 ...
Страница 378: ...8 34 ELEC LIGHTING SYSTEM ...
Страница 404: ......
Страница 405: ...TRBL SHTG 9 ...
Страница 415: ......
Страница 416: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...